Delivery of ultra-low maintenance cargo lift! This recently delivered modular cargo lift for Aker BP’s new Valhall PWP p...
24/09/2025

Delivery of ultra-low maintenance cargo lift!

This recently delivered modular cargo lift for Aker BP’s new Valhall PWP platform is optimized for very low maintenance.
The structure and most mechanical components are made of stainless steel. With no winch wires to replace, automated lubrication, and several other features, maintenance is reduced to an absolute minimum.

Thank you for the order, and a big thanks to the team for their outstanding effort!

Successful installation of BOP access system on Transocean Norge.Having a safe BOP access solution in place within minut...
25/08/2025

Successful installation of BOP access system on Transocean Norge.

Having a safe BOP access solution in place within minutes—rather than spending hours building and dismantling scaffolding—will save substantial rig time during each BOP operation and pays for itself in a very short period.

Retrofitting such a system on an existing rig, is a complex task. It requires precise engineering, 3D scanning, and detailed operational planning. The images show the recently installed BOP access platform, highlighting the tight tolerances involved in getting it properly fitted.

We’ve completed several of these projects and now have the experience to deliver them efficiently and safely.

Great thanks to Transocean for this opportunity.

https://youtu.be/6UpXDrF78dg

Our patent pending Telescopic Energy Absorbing Mousehole [TEAM] is now operational after successful commissioning onboar...
17/06/2025

Our patent pending Telescopic Energy Absorbing Mousehole [TEAM] is now operational after successful commissioning onboard DS Stavanger.

Stavanger Engineering’s Mousehole can due to its short length operate at all weather conditions with a full length 90 ft stand. This in contrast to conventional designs that must be shortened during winter conditions in the North Sea.

The Mousehole can also be skidded to the side when not in use, thus saving 6 – 8 hours of rig time several times a year compared to a rotary sock that needs to be removed..

The savings in rig time and increased weather window will therefore pay off the investment in a short time.

Here is an animation showing how it works: https://youtu.be/rlqifk1jyhM

https://www.linkedin.com/posts/personalhuset_stavanger-engineering-s%C3%B8ker-senior-project-activity-732541457944062771...
07/05/2025

https://www.linkedin.com/posts/personalhuset_stavanger-engineering-s%C3%B8ker-senior-project-activity-7325414579440627713-vYFX?utm_source=share&utm_medium=member_desktop&rcm=ACoAABGGTAgBeK2MBXWMK6SNdqUEjzRnqOcQ0dI

Stavanger | Vil du jobbe i et selskap som lager smarte, tekniske løsninger fra idé til ferdig installasjon? Hos Stavanger Engineering blir du en del av et voksende teknologimiljø som utvikler smarte, mekaniske spesialløsninger til borerigger og offshore-installasjoner verden over. Som 𝐒𝐞.....

We have received an order for two more low-pressure high-volume mud pumps! Stavanger Engineering will deliver two compac...
16/04/2025

We have received an order for two more low-pressure high-volume mud pumps! Stavanger Engineering will deliver two compact skid-mounted mud pumps that will be used in special drilling operations worldwide.

In the picture is a previous example of a skid-mounted mud-pump with 1000 l/min capacity at 6 bars. The pump output is precisely controlled by a Variable Frequency Drive using input from pressure sensors and a flow meter. Safety features include dry-run sensing.

The new delivery includes pump, control cabinet with variable frequency drive and data exchange to higher level control system.

Here is a rapid-response modular handling system designed for the quick replacement of electrical motors crucial for exp...
14/03/2025

Here is a rapid-response modular handling system designed for the quick replacement of electrical motors crucial for exporting hydrocarbons from platforms. Time is of the essence when these motors fail, making swift replacement essential. The system's modular design allows for easy setup in low-headroom spaces using pallet jacks. With a lifting capacity of 30 tons, the lift and trolley ensure efficient and effective motor replacements.

This is a typical example of tailored mechanical equipment made according to client need.

Vi søker etter ingeniør med interesse for strukturanalyse. Kjekk mulighet for deg som skal avslutte studier til sommeren...
10/02/2025

Vi søker etter ingeniør med interesse for strukturanalyse. Kjekk mulighet for deg som skal avslutte studier til sommeren, eller ikke har så mye erfaring.

Vi lager nye og innovative løsninger, har et solid fagmiljø og varierte oppgaver.

Arbeidsoppgaver - Styrkeberegning og analyse av maskiner og strukturer som del av team i interne prosjekter. Arbeidet foregår i mindre team med utvikling av

16/01/2025

Introducing the New Telescopic Energy Absorbing Mousehole and New Moonpool Tubular Support Tool developed by Stavanger Engineering.

Our Telescopic Energy Absorbing Mousehole can catch dropped tubulars without being removed when not in use, thus saving 6 – 8 hours of rig time several times a year.

The second equipment shown is our Moonpool Tubular Support Tool. For supporting of drill pipe and tubulars and enable operation in harsh weather and high current conditions.

The current designs of mouseholes in the marked either do not have energy absorbing capabilities, or have longer length and thus see excessive green sea loads during harsh weather. This makes it necessary to shorten the length of the mousehole during winter season. Stavanger Engineering’s Telescopic Energy Absorbing Mousehole [TEAM] can operate at all weather conditions with a full length 90 ft stand. In addition, TEAM can be retracted and skidded away when not in use, eliminating 6 – 8 hours of rig time several times per year. TEAM is designed to absorb the energy from a 27.000 lbs / 12.250 kg drill collar stand dropped from 96 ft. The equipment will be delivered in Q2-2025 and installed on Deepsea Stavanger.

The Moonpool Tubular Support Tool is used to support tubulars and keep the rig working for longer in harsh weather and high current conditions. The first Moonpool Tubular Support Tool was delivered in 2020 and has a proven track record as a reliable tool to keep tubulars vertical during harsh weather and high current conditions. Another Moonpool Tubular Support Tool will be delivered to Deepsea Aberdeen during Q2-2025.

The patent pending solution is yet another example of the tailored solutions that we like to do at Stavanger Engineering.

Thanks to Odfjell Drilling for the orders and a good cooperation on these projects!

Be a part of our team?Stavanger Engineering are looking for the following positions:Senior Engineers, purchaser and Proj...
10/09/2024

Be a part of our team?
Stavanger Engineering are looking for the following positions:
Senior Engineers, purchaser and Project Managers!

Address

Moseidveien 1

4033

Alerts

Be the first to know and let us send you an email when Stavanger Engineering posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Stavanger Engineering:

  • Want your business to be the top-listed Engineering Company?

Share