WellGuard A new standard for multi-string barrier verification.

Last week we tested our tool`s mechanical integrity against 10,000 psi, or 689 bars pressure at Archers facility at Karm...
22/08/2023

Last week we tested our tool`s mechanical integrity against 10,000 psi, or 689 bars pressure at Archers facility at Karmøy.

When assembling the tool, blue paper was installed at strategic places inside the tool such to easier identify any leak as this would result in a darker paper.

The tool assembly (excluding electronics) was tested using a lubricator pressurized with water.

The result; no leak (as shown in one of the pictures post test)! 😀

A fantastic day at a splendid facility with some great people!

Looking forward to our next test!

This is a pressure bulkhead, a great piece of engineering and a solid portion of manufacturing competence and skills. Th...
18/08/2023

This is a pressure bulkhead, a great piece of engineering and a solid portion of manufacturing competence and skills. The inserts are electrical feedthroughs that transfer electrical signals and power through the unit.

Combined, the bulkhead and the installed electrical feedthroughs are the barrier that protects the internal electronics in the tool from being flooded by high pressure well fluid.

We have now pressure tested this assembly to 10,000 psi, or 689 bars for more than 12 hours!

Another step forward for the WellGuard team!

Also a huge thank you to our suppliers and partners!

On our track towards an offshore pilot, we are performing a series of high-pressure function tests of critical assemblie...
16/08/2023

On our track towards an offshore pilot, we are performing a series of high-pressure function tests of critical assemblies used in our tool.

We have recently successfully function tested our rotate motor assembly operating in a pressurized environment of 10,000 psi, or 689 bars. This assembly is a fantastic piece of engineering important for us to perform high resolution measurements in wells.

To put things in perspective, 10,000 psi equals the weight of a water column of 6,890 meters, or the weight of a cement column of 2,870 meters.

Great work by our team in WellGuard! This is an important tick in the box!

WellGuard and its team just received the Seal of Excellence from the European Comission recognizing our development as a...
23/11/2022

WellGuard and its team just received the Seal of Excellence from the European Comission recognizing our development as a high-quality project!

A fabulous day at the   Forum with highly relevant and exciting topics!Met a lot of great people from the industry and w...
16/11/2022

A fabulous day at the Forum with highly relevant and exciting topics!

Met a lot of great people from the industry and we also got the opportunity to present WellGuard`s technology to the Minister of Petroleum and Energy, Terje Aasland.

Co-operation is the way forward!

15/11/2022

Tomorrow WellGuard is participating and showcasing its groundbreaking technology at the OG21 forum hosted by The Norwegian Research Council.

An important topic this year is how the norwegian petroleum industry can contribute with new knowledge and technology to increase safety in supply, reduce emissions of climate gases, and create value for companies and the society.

https://www.og21.no/

If you are not able to visit you may attend virtually via the following link:

https://vimeo.com/event/2606523/f444fd18ca

Wondering what we are developing, have a look:

A fantastic week in the Innovation Park at the  !Incredible inspiring and motivating to see the amount of interest in ou...
01/09/2022

A fantastic week in the Innovation Park at the !
Incredible inspiring and motivating to see the amount of interest in our unique through tubing barrier evaluation technology!
Thank you so much to all visitors and the !

Want to meet the team developing an impressive through tubing barrier evaluation technology?The technology will bring lo...
19/08/2022

Want to meet the team developing an impressive through tubing barrier evaluation technology?
The technology will bring logging and barrier evaluation to the next level in accuracy and reliability enabling rig less P&A.
Meet us in Hall 8 at the Innovation Park!