02/02/2024
This week with the full team finally back from holiday we got stuck into a few different projects.
The first job this week was replacing a back door deck as the metal posts were rusting away! We replaced and upgraded the deck. then went about realigning the stairs and making some new treads. Equiped with some temporary handrails to give the customer a new strong and safe way of getting out the back door.
Second job was repairing a bathroom that’s been leaking for a long time.. we actually started this pre Christmas but after removing the linings and assessing the waters damage we head to let things dry out. With things finally dry, we got in and replaced the rotten floor area and built a new wall to create the shower cubicle! Getting it ready for plumbers and sparkies to take over.