Concrete Logistics Ltd

Concrete Logistics Ltd Commercial - Civil - Residential
FREEPHONE 0508 PLACER

Thank you to ASB Bank for hosting us at the tennis yesterday. We had a wonderful time. Thank you!
08/01/2026

Thank you to ASB Bank for hosting us at the tennis yesterday. We had a wonderful time.
Thank you!

🎬 It’s a Wrap for 2025 🎬As 2025 comes to a close, we want to take a moment to sincerely thank our customers, staff, and ...
19/12/2025

🎬 It’s a Wrap for 2025 🎬

As 2025 comes to a close, we want to take a moment to sincerely thank our customers, staff, and suppliers for your continued support throughout the year.

There’s no doubt this year has been harder than most, but it’s during challenging times that strong relationships, teamwork, and resilience really show. We’re incredibly grateful to everyone who has stood alongside us, worked through the pressure, and kept things moving.

We’re heading into the New Year feeling positive and hopeful, and we’re looking forward to a better, brighter year ahead in 2026.

🎄 From all of us at Concrete Logistics, we wish you and your families a very Merry Christmas and a safe, relaxing holiday period.

🚧 Please note:
We will have a small crew operating over the break to manage special projects.
Our full team returns Monday 5th January 2026.

Thank you again for being part of our journey — see you in the New Year!

14/12/2025

🚧 Concrete Logistics – Job Interview Invitation 🚧 👷🏽‍♂️

Carpenters/ Formworkers - shortlisted candidates are invited to attend an in-person interview.

📍 Location: Concrete Logistics Yard

6H Henderson Place, Onehunga

🕢 Time: 7:30am

📅 Date: Monday, 22 December

📄 Before attending, please email your current CV and valid work visa (if applicable) to:

✉️ [email protected]

✅ Preference will be given to NZ Citizens or Permanent Residents.

🔹 AEWV applicants will also be considered.

⚠️ Applicants must be living in New Zealand on 22 December – overseas applications will not be considered at this time.
No job hire companies or contractors will be considered.
This is a permanent role. Multiple roles are available.

We look forward to meeting suitable candidates.

Concrete Logistics HQ is coming along nicely! Watch this space for more. ETA early 2026.
28/11/2025

Concrete Logistics HQ is coming along nicely! Watch this space for more. ETA early 2026.

20/10/2025

Concrete Logistics has provided Concrete Placing, Pumping and Shotcrete on Elysian Apartments in Parnell for Kalmar Construction. Progress to date here ⬇️

❤️Congratulations to these two lovebirds. ❤️Finally tying the knot after 13 years and 3 kids together. As Beyoncé says i...
01/09/2025

❤️Congratulations to these two lovebirds. ❤️

Finally tying the knot after 13 years and 3 kids together. As Beyoncé says if you like it then put a ring on it! 👰🏼🤵🏽‍♂️💍💃🏼

We send our warmest wishes to Kylie and Marcel and their whanau.
From all of the crew @ Concrete Logistics! 🍾🥂

We popped in to say “Yellow” 😃 to the Ockham Residental team for the official opening of Kōanga in Waterview on Friday. ...
09/06/2025

We popped in to say “Yellow” 😃 to the Ockham Residental team for the official opening of Kōanga in Waterview on Friday. Mayor Wayne Brown did the honour of declaring the building open. This slice of sunshine is a BTR (Build to Rent project).

We loved -

💛The incredible view from one of their Three Bedroom Apartments
💛Curved walls that added interest
💛Spacious balconies
💛Floor coverings
💛 The yellow coloured bricks - perfect to add a little sunshine in a dreary grey winters day.
💛 Being part of another successful build by Ockham who inject colour and interest to our city.

Throwback to Saturday, 9th November 2013. Marsden Point Oil RefineryA rather large concrete pour - estimated to be one o...
09/05/2025

Throwback to Saturday, 9th November 2013.
Marsden Point Oil Refinery

A rather large concrete pour - estimated to be one of NZ’s largest concrete pour’s of the time. A good job to cut our teeth on as a new company formed that very same year. Lots of lessons, learnings and lack of sleep!

What requires 2746 cubic metres of concrete, 16 hours, and a continuous fleet of 60 trucks to complete? The personnel at NZ Refining, which operates the Marsden Pt Oil Refinery, have the answer - the base for the refinery's $365 million Continuous Catalyst Regeneration Platformer project. The $365-million CCR project will enhance the refinery's capabilities to meet 80 per cent of New Zealand's fuel needs, providing a more reliable fuel source. The construction work will also generate approximately 300 on-site jobs and hundreds more off-site over the next four years. On Saturday, a convoy of 60 concrete trucks transported 550 separate loads over 16 hours to pour 2746 cubic metres of concrete into a 1.5 to 2-metre deep hole for the base.

Awww shucks! Thank you Gilby Construction Ltd Happy Easter to the team!
17/04/2025

Awww shucks! Thank you Gilby Construction Ltd
Happy Easter to the team!

Great effort from the boys today, we don’t often head north into the Blues territory!
Cheers to Concrete Logistics Ltd for the outstanding pumping and laying today !
Im sure this school in Remuera will love these resurfaced tennis courts when Teamturf are finished with them!

Shout out from our friends @ Putzmeister Group! Why buy the rest when you can buy the best?
17/04/2025

Shout out from our friends @ Putzmeister Group!
Why buy the rest when you can buy the best?

iONTRON goes worldwide ❗️🌍

Zero emissions, full performance – concrete pumping with a greener footprint! 🌱

Our iONTRON truck-mounted concrete pump at work in New Zealand. 🇳🇿

Visit us at bauma in Hall B6 from 7th to 13th April and find out more about our iONTRON products!

Address

6H Henderson Place
Auckland
1061

Alerts

Be the first to know and let us send you an email when Concrete Logistics Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Concrete Logistics Ltd:

Share