04/09/2026
Fixed tie-in points. Tight footprint. No room to improvise.
We designed the Titan 10K filter replacement around the constraints from day one - site measure, 3D model, in-house fabrication, then straight onto site with no surprises.
That's the benefit of doing design and fab under one roof.
🔗 nzmechtech.co.nz/project-titan-filter