15/09/2025
🏗️ Sudima Hotel, Kaikōura
92 tonnes of Layher scaffolding, up to 12m high and 250m around the façade — fully wrapped so work could power on through winter.
Tough coastal site? No problem. Our crew delivered a safe, tidy scaffold that kept the project moving. Proud to see Elliott Scaffolding standing behind another landmark build.
🏗️𝗦𝗰𝗮𝗳𝗳𝗼𝗹𝗱 𝗣𝗿𝗼𝗷𝗲𝗰𝘁: 𝗦𝘂𝗱𝗶𝗺𝗮 𝗛𝗼𝘁𝗲𝗹, 𝗞𝗮𝗶𝗸𝗼̄𝘂𝗿𝗮
Precision, performance, and 92 tonnes of Layher Allround Lightweight scaffolding - delivered by Elliott Scaffolding.
Tough coastal conditions, a remote site, and a two-year timeline didn’t slow them down. Using Layher’s modular system, they built up to 12m high and 250m around the façade, fully encapsulating the hotel for uninterrupted winter work.
👏 Thanks to Elliott Scaffolding for the incredible work and photos.
🔗 Read the full article here: https://www.layher.co.nz/sudima-hotel-construction-kaikoura/