Mike Downs Contracting

Mike Downs Contracting The company specialises in the management of a team of experienced contractors to produce high quality, urban street renewal and land development renewal.

Mike Downs Contracting Limited was incorporated 18 June 1999. The company specialises in the management of a team of experienced and competent contractors to produce high quality, well managed urban street renewal and land development contracts. We have successfully completed approximately 100 urban street renewal contracts for the Christchurch City Council, 18 subdivisions for private developers,

major earthquake repairs on SCIRT contracts plus numerous driveways, tennis courts and commercial projects. The Company has an excellent network of resources, working with over 30 subcontractors to complete multiple projects to the required safety, quality, environmental standard and the specified timeframe. Sub-contractors are selected according to the availability of resources, specific job requirements and individual track records.

Stage 6 of Redmund Spur is now complete. Huge effort by all the team to get this finished. We would also like to thank t...
09/05/2024

Stage 6 of Redmund Spur is now complete. Huge effort by all the team to get this finished. We would also like to thank the client Dan van Asch, the Engineers Fox and Associates and our many sub-contractors that helped to complete this contract.
Checkout those great views over Christchurch.

Final touches coming together on Westmorland Stage 6. Beautiful views overlooking the city.
12/04/2022

Final touches coming together on Westmorland Stage 6. Beautiful views overlooking the city.

29/07/2021

Earthworks & Paving is a locally owned construction company with over 20 years experience working in and around the Canterbury area. We are a small and dedicate...

20/09/2020
Check out some before and after shots of a couple of our recently completed projects
10/09/2020

Check out some before and after shots of a couple of our recently completed projects

Marine Parade and Beresford St will be reopened from 6pm tonight
23/06/2020

Marine Parade and Beresford St will be reopened from 6pm tonight

๐”๐๐ƒ๐€๐“๐„ ๐Ÿ๐Ÿ: ๐Œ๐š๐ซ๐ข๐ง๐ž ๐๐š๐ซ๐š๐๐ž ๐’๐ญ๐ซ๐ž๐ž๐ญ๐ฌ๐œ๐š๐ฉ๐ž ๐’๐ข๐ญ๐ž๐ฐ๐จ๐ซ๐ค๐ฌ๐–๐ก๐ž๐ซ๐ž ๐š๐ซ๐ž ๐ฐ๐ž ๐š๐ญ:โ€ข Western side footpath complete between Brighton Mall and...
10/05/2020

๐”๐๐ƒ๐€๐“๐„ ๐Ÿ๐Ÿ: ๐Œ๐š๐ซ๐ข๐ง๐ž ๐๐š๐ซ๐š๐๐ž ๐’๐ญ๐ซ๐ž๐ž๐ญ๐ฌ๐œ๐š๐ฉ๐ž ๐’๐ข๐ญ๐ž๐ฐ๐จ๐ซ๐ค๐ฌ
๐–๐ก๐ž๐ซ๐ž ๐š๐ซ๐ž ๐ฐ๐ž ๐š๐ญ:
โ€ข Western side footpath complete between Brighton Mall and Beresford St
โ€ข Eastern side kerb and channel has been installed
โ€ข Excavation and prep work completed on Southern side of Brighton Mall
โ€ข Some of the street furniture has been installed in Brighton Mall.
๐–๐ก๐š๐ญโ€™๐ฌ ๐๐ž๐ฑ๐ญ:
Brighton Mall to Beresford St
โ€ข Continue construction and laying of pavers in Brighton Mall together with the installation of more street furniture.
โ€ข New street lights to be installed and removal of the temporary lights on the Eastern footpath outside the library.
โ€ข Start preparation of the Eastern footpath outside the library
โ€ข Asphalt to be laid at Southern end of the mall
โ€ข Closure of Marine Parade / Beresford St to start construction of the new intersection.

Even though we haven't been onsite we have been busy at home preparing for Alert Level 3. We will be starting back on Tu...
26/04/2020

Even though we haven't been onsite we have been busy at home preparing for Alert Level 3. We will be starting back on Tuesday 28th April and all of our sites will have implemented new Covid19, health and safety protocols. We want to ensure all of our staff, contractors and visitors are kept safe on all of our work sites.
We are looking forward to getting back up and running in what will be a new and challenging environment for us all.

UPDATE 11: Marine Parade Streetscape SiteworksWhere are we at:Hawke Street to Brighton Mallยท The paving of footpaths bet...
15/03/2020

UPDATE 11: Marine Parade Streetscape Siteworks
Where are we at:
Hawke Street to Brighton Mall
ยท The paving of footpaths between Countdown and the Mall has been completed.
Beresford St and Brighton Mall:
ยท Rain gardens, kerb and drainage completed on the Western Side.
ยท The excavation & prep work on the Western Footpath is complete & pavers are currently being laid.
ยท Median strip has been removed & road has been excavated.

What's Next:
Brighton Mall to Beresford St
ยท Excavate and prep for Eastern Kerb
ยท Footpath prep on Eastern side
ยท Start excavation and prep for pavers on southern side of Brighton Mall leaving pedestrian access
available on Northern side of mall.

Road Closure:
A full road closure will be in place on Marine Parade from Brighton Mall to the south side of the Beresford
St intersection including the carpark south of the library. The road closure will be in place from Wednesday
25th March 2020 to Thursday 30th April 2020. Please see attached map

๐”๐๐ƒ๐€๐“๐„ ๐Ÿ๐ŸŽ: ๐Œ๐š๐ซ๐ข๐ง๐ž ๐๐š๐ซ๐š๐๐ž ๐’๐ญ๐ซ๐ž๐ž๐ญ๐ฌ๐œ๐š๐ฉ๐ž ๐’๐ข๐ญ๐ž๐ฐ๐จ๐ซ๐ค๐ฌ๐—ช๐—ต๐—ฒ๐—ฟ๐—ฒ ๐—ฎ๐—ฟ๐—ฒ ๐˜„๐—ฒ ๐—ฎ๐˜:Western side between Beresford St and Countdownโ€ข Western s...
27/02/2020

๐”๐๐ƒ๐€๐“๐„ ๐Ÿ๐ŸŽ: ๐Œ๐š๐ซ๐ข๐ง๐ž ๐๐š๐ซ๐š๐๐ž ๐’๐ญ๐ซ๐ž๐ž๐ญ๐ฌ๐œ๐š๐ฉ๐ž ๐’๐ข๐ญ๐ž๐ฐ๐จ๐ซ๐ค๐ฌ
๐—ช๐—ต๐—ฒ๐—ฟ๐—ฒ ๐—ฎ๐—ฟ๐—ฒ ๐˜„๐—ฒ ๐—ฎ๐˜:
Western side between Beresford St and Countdown
โ€ข Western side footpath between Brighton mall and Countdown: The footpath prep work has been completed.
โ€ข Western side between Beresford St and Brighton Mall: The first rain garden has been completed.
โ€ข Street Lights: These have been removed from the centre traffic islands and relocated.
๐—ช๐—ต๐—ฎ๐˜โ€™๐˜€ ๐—ก๐—ฒ๐˜…๐˜:
Western side between Beresford St and Countdown
โ€ข Pavers are currently being laid between Brighton Mall and Countdown
โ€ข Beresford St to Brighton mall drainage completion and construction of last rain garden.
โ€ข Median Island to be removed.
โ€ข Kerb and V channel installation on Western side footpath
โ€ข Excavate and prep Western footpath.
Reminder: Marine Parade will be closed between Beresford St and Brighton Mall from Weds 11th March to allow the road to be re-constructed

With the great weather we are having I'm sure all the kids in the neighbourhood will be down checking out the refreshed ...
26/02/2020

With the great weather we are having I'm sure all the kids in the neighbourhood will be down checking out the refreshed playground area and new equipment we have recently installed at Paddington reserve.

Address

7 Outlook Place, Harewood
Christchurch
8051

Alerts

Be the first to know and let us send you an email when Mike Downs Contracting posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share