01/12/2025
π·ββοΈπ·Our Drill Team joined forces with Isaac Construction on Bridge Street for the Nelson City Council Bridge to Better project. Drilling 200m to install two 160mm power ducts and one 63mm duct, hitting depths of up to 3 metres. All in 10 days π§β‘