Floating shelves 😍 4.5m long! No brackets!
Turns out our head builder is pretty handy with a welder too - 44 metal pegs hidden in these finished timber shelves!
We added a couple into a study nook too!
04/11/2026
Pigment sealed and gib stopping underway 👏
04/11/2026
A window addition, some fresh weatherboards and a new lick of paint 👍
Swipe for the before ➡️
26/10/2026
Gib stopping almost complete at our Hokowhitu project 👍 Looking good KM Plastering Services!
19/10/2026
Time to upgrade this outdoor area 💫
Decking removed, post removal and ground prep underway tomorrow 🤙watch this space!
17/10/2026
Reconfiguring 18sqm and adding to the existing space makes all the difference!
Check out the before and after floor plans ➡️
15/10/2026
Another project underway! Linings stripped, flooring pulled up and walls cleaned down ready for new insulation and gib!
Swipe for the before photo ➡️
Renovation project on the horizon?
Give us a call 📞 0210572770
14/10/2026
Gib installed and ready for stopping. Check out the raked ceilings - how good!
Be the first to know and let us send you an email when A-Stage Construction Limited posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.