01/09/2026
A little update on the Dustex project we showed you in the workshop recently.
The clean air section was connected to the top body and hopper sections, bringing the whole unit together after a lot of work from the team.
From there, it was broken over ready for transport, loaded up and sent on its way to site.
A really good project for a great customer, and always satisfying to see something of this size leave the workshop ready to do its job.