Tile Preparation - 👌
Deep infills required 35-55mm to be built up to height as require.
Builders now can start with the bathroom layout.
#DoneWithPurpose
#LevellingCompounds
#TheTakeOver
#GrindNPrepLTD
Grinding high spots along control joints for smooth transitions for forklifts etc. Massive warehouse 7000m2 👌#GrindNPrepLTD#WeTheBest
Gloss ceramic tile to a Matt finish. This was a tough job , what a process !!!! We got the tick of approval 🤙. #GrindNPrepLTD
When builders place concrete and get it wrong , they call Grind N Prep LTD for our services.
Resurfacing works have started job not yet complete due to weather 😅. Here’s a little snip, massive difference!!!!
#GrindNPrepLTD
#OnTheRise
#TheTakeOver
Small residential we got done the other day.
Clients Had rising damp issues and reached out through a carpet franchise who highly recommended Grind N Prep LTD.
Grind N Prep LTD are located in Wellington, Nz. Feel free to reach out if you require any floor Preparation or would like any advise, we would be happy to help out.#GrindNPrepLTD
New Client has reached out so we push this through straight away👌
Few extra hours for the boys , something light !!
Removing thick Glue adhesive ready for Preparation for new floor coverings.
#GrindNPrepLTD
Floor Preparation for All floor coverings.
- Ceramic Tiles
- Timber Flooring
- Vinyl
- Carpet
- Grind and Seals
- Moisture Barriers
#GrindNPrepLTD
Penthouse - Tile Preparation 👌
First day for 2023.
Happy new years everyone, let’s get it !!!!
X2 Apartments needing resurfacing for New Vinyl planking.
Underfloor heating , Floor Preparation for new ceramic Tiles
Grinding to remove glue adhesive and bitumen’s for new floor coverings. Patch and repair also done 👌
#GrindNPrepLTD
#FloorPreparation
GrindNPrepLTD start to finish - Pouring to create a Level surface all in half a day 🔥#FloorPreparation#GrindLife
Stage 1 - All Screed work , All done by hand 🤚 Creating fall as Requested . 164 bags loaded and completed the same day Stage 2 here we come!!!!!! #GrindNPrepLTD
Residential Property -
Grinding Glue and Tile adhesive
#GrindNPrepLTD
65mm build up , leaving a 15mm rebait for new ceramic Tiles. 👌
#LevellingCompounds
#FloorPreparation
#GrindNPrepLTD
Tik tok’s business platforms. Grind N Prep LTD currently don’t have tik tok but we were contacted though messages etc.
Tiler installed new tiles next afternoon no issues 👌
Just a little re cap , More vids of Grind N Prep LTD in action coming soon !!!
Floor Prep for new instalment of ceramic tiles.
Stage 2 completed. (After hours work )
- Tiles uplifted
- Tile adhesive ground back and removed
- Primed and patched as required
- Set heights as required
- Pour levelling compound
- Ready to receive new ceramic tiles
#GrindNPrepLTD
#FloorPreparation
#Levellingcompounds
#DiamondGrinding
Stage 1 of 2 stages 👌(After hours)
- Uplift Tiles
- Grind to remove tile adhesive
- Set heights
- Prime and Pour (Levelling Compounds) to create a new surface for instalment of new tiles .
#GrindNPrep#FloorPrep#MassiveYearAHead
Client wanted a level floor for new instalment of Tiles and wanted us to create 25mm fall for a slot drain in the shower area.
- Setting Heights
- Pour levelling Compounds to set heights
- Form a shower screed with required fall
- Grind channel to allow slot drain to be installed
Leaving a 15mm rebate for tiles to finish Flush.
House is up for home of the year 2021.
( Hence I can’t show you anything else )
No one sees the Prep work that goes into the prep for finishing floor coverings.
Tiles , Carpet , Vinyl Planks , Grind N Seal .
#GrindNPrepLTD
#FloorPreparation
Levelling compound.
We were approached to resurface this corridor and to box and pour stair landings as they Were out of level.
Got this done and handed over the next afternoon.