Its been a while since we've put a post up. Mainly due to the fact that our work load has been incredibly busy. Today we completed the Golden Row on the Galatea Solar Farm. A project that has taken many years to finally break ground on. Its an exciting project which is designed to incorporate the existing dairy farming along side with generating electricity. The tracking system has been designed to a height where the 10 hectares of paddocks covered by the solar panels can be grazed at night. The tracking system will park the panels at 0 degrees which will keep them out of reach of the cows and allow them to graze the pasture. The cows will be removed from the Solar Farm area before sunrise and the system will then automatically adjust the panels to track the sun during the day to optimise the full potential of generating electricity from the sun. The fulll amount of generated electricity will be injected into the local distribution network supplementing the local consumption needs.
The site will will have 4.7MW DC of PV panels and able to inject 3.6MW of AC power into the local network.
1 row down. 125 more to go.
Clenergy AUS & NZ.
SEANZ
SunPower
TCL Electronics
Huawei
Sue Gordon
Rory Gordon