25/02/2019
CNCEC Third Construction Company is a sub-contractor from People's Republic of China, currently delivering its manpower-based construction service on Cobre Panama Project in PACO Power Plant, Tailing Management Facilities, Mine Service Area, and Sand Cycloning Area, covering disciplines of power plant boilers, mechanical equipment, piping, insulation & refractory, structural, E&I.
Highlights:
400 million+ safe Mhrs all over the Cobre Panma Project
Installation, hydrotesting, ASME accreditation of 2 units of 150MW ASME Boilers, with the steam capacity of 450t/h, and first-pass yield of 98.93% on 3636 welds subjected to radiographic testing and PAUT.
60,000+ DB installation of boiler external piping, process piping, and turbine piping for both units.
50,000+ DB installation of fist piping all over the PACO power plant.
10000 m + welds on boiler air and gas ducting system, GAH system, ESP system, Chimney etc.
60,000+ ㎡of insulation for the boiler proper, boiler external piping, process piping and turbine piping, air and gas ducting system, ESP system, FGD and etc.
Installation of 2 units drydock and pontoon station, including 16 pumps and associated piping, structural steel.
40000+ DB of installation of process piping at the Mine area 322, 321, 311, 301 at Mine Site.
Together with our client FQML/MPSA, we are firmly believed and dedicated to achieve the common goals of this project and dilver first class contruction service to client's satisfactory.