20/03/2026
🌉 Technical Hydrological & Hydraulic Assessment – Yarta Bridge Project
MMI Civil Solution was engaged by Teyewai Investment Properties Limited to undertake a hydrological and hydraulic assessment for the proposed Yarta Bridge.
The scope involved detailed catchment delineation, flow estimation, and flood frequency analysis to establish design discharge parameters.
Using GECRAS hydraulic modelling, we simulated channel geometry, flood behaviour, and energy grade line profiles to evaluate hydraulic performance under multiple design storm events. Model outputs informed the determination of the required bridge waterway opening, deck soffit level, and cross‑sectional geometry to ensure conveyance capacity, structural resilience, and compliance with design standards.
This technical assessment provides an evidence‑based foundation for the bridge’s conceptual and detailed design phases.
For More information
Email: [email protected]
M/Phone: 7903 1515
LinkedIn: MMI Civil Solution
Facebook: MMI Civil Solutions
hashtag hashtag hashtag hashtag hashtag hashtag hashtag hashtag hashtag