☀️ Powering Connectivity, Rain or Shine.
Our team has been braving the sun over the last few days to ensure vital communications infrastructure stays online—no matter what. We’re installing a robust hybrid backup solar system for a critical communications tower, ensuring uninterrupted power for essential connectivity.
What’s going in:
🔹 24 x 475W Longi PV Panels
🔹 25kW Sigenergy Three-Phase Energy Controller
🔹 3 x 8.3kW Sigenergy Battery Packs (25.8kW total)
🔹 60kW Three-Phase Sigenergy Gateway
Progress update: Welding, bracing, and railing are nearly complete. Next up: earthing, PV panel mounting, and DC/AC cabling.
This hybrid system is grid-tied and generator-ready for maximum downtime protection. Plus, with the MySigen App and a 4G dongle, the client can monitor real-time generation and consumption from anywhere.
Stay tuned for the final switch-on! 🔋📡