Construction Project in Bulacan-Bulacan 6 units Loft Type Apartment. Project Cost 3.8M. 2.5 months progress,, Previous m...
19/10/2026

Construction Project in Bulacan-Bulacan 6 units Loft Type Apartment. Project Cost 3.8M. 2.5 months progress,, Previous months was challenging rainy days. Late upload ๐Ÿ˜‚
Credits daw sa tophographer Brent Jungco

Muzon Project: GROUND BREAKING35sqm lot area. 2BR 2TB Floor Area 70 sqm. "We Build Dreams"
04/10/2026

Muzon Project: GROUND BREAKING
35sqm lot area. 2BR 2TB
Floor Area 70 sqm.
"We Build Dreams"

Project Update:Lot area: 240 sqmHouse & Lot with Private PoolTower Grotto Ville SJDM80% progress.
27/09/2026

Project Update:
Lot area: 240 sqm
House & Lot with Private Pool
Tower Grotto Ville SJDM
80% progress.

Late upload ๐Ÿ˜…:Project Update: Almost finished:lot area: 150 sqmHouse & Lot with private pool.Grace Ville SJDM
27/09/2026

Late upload ๐Ÿ˜…:
Project Update: Almost finished:
lot area: 150 sqm
House & Lot with private pool.
Grace Ville SJDM

"AI has made floor tile mockup design faster and easier than ever."
13/06/2026

"AI has made floor tile mockup design faster and easier than ever."

05/03/2026

S&J Construction: "We Build Dreams"
On Going Project in SJDM House & Lot with Private Pool

Send a message to learn more

S&J Construction: "We Build Dreams"On Going Installation of Reticulation System
28/02/2026

S&J Construction: "We Build Dreams"
On Going Installation of Reticulation System

S&J Construction: "We Build Dreams"Daniela Town House Project UpdateSoil Test Muna Tayo Para maka sigurado
24/02/2026

S&J Construction: "We Build Dreams"
Daniela Town House Project Update
Soil Test Muna Tayo Para maka sigurado

S&J Construction: "We Build Dreams"Project Lea Update:Mobilization Day 1 Feb 24, 2026
24/02/2026

S&J Construction: "We Build Dreams"
Project Lea Update:
Mobilization Day 1 Feb 24, 2026

S&J Construction: "We Build Dreams"Cavite Project Update, Phase Progress, 2nd Floor.
24/02/2026

S&J Construction: "We Build Dreams"
Cavite Project Update, Phase Progress, 2nd Floor.