Site inspectionPreparation for concrete toppingWork program and scope of worksJACO Construction
02/05/2024

Site inspection
Preparation for concrete topping
Work program and scope of works

JACO Construction

Community Trashbin (Full Concrete)
02/03/2024

Community Trashbin (Full Concrete)




Typical Design for the Residential BuildingBefore and Current Construction Timeline- Prior to construction, structural a...
13/02/2024

Typical Design for the Residential Building

Before and Current Construction Timeline

- Prior to construction, structural assessment was conducted per client's request to strengthen the old structure and see what can be saved based on client's alloted budget.
- Retrofitting was not applicable since the entire structure was very weak and some parts are shaking. No Beam Installed, and Slab uses 8mm bars with a rib type color roof sheet acting as a steel deck.

- As a result of entire survey and several revisions, Complete Demolish was recommended and reconstruction was done to ensure the safety and security of the client.

- Construction is currently at 100% on Structural and already starting the Simple Architectural Works and Other Related Works.

For any construction and design inquiries, feel free to message our page or email us for assistance.

[email protected]πŸ“©πŸ“§
- Abante Blueprinting thank you for providing blue prints for this project

31/12/2023

Thank you 2023
Thank you clients
Thank you team sa supports

Looking forward for more opportunities to come.

Happy new year everyone.

Previously. Pahalipay ug Pasalamat sa inyong ka kugi.Padayun ta nga mag uban sa mga sumusunod pa nga tuig!Merry Christma...
27/12/2023

Previously. Pahalipay ug Pasalamat sa inyong ka kugi.
Padayun ta nga mag uban sa mga sumusunod pa nga tuig!

Merry Christmas again!
Have a happy and prosperous 2024 kanato.
πŸŽ‰πŸŽ‰



20/12/2023

Topping off.
Wednesdays

Strriping out of forms
On-going architectural works

MCON
[email protected]


Rebar installation for column in 2nd floorAnd stripping out of formsGetting ready for concrete pouring for 2nd floor col...
15/09/2023

Rebar installation for column in 2nd floor
And stripping out of forms

Getting ready for concrete pouring for 2nd floor column

[email protected]πŸ“©

Team Pana 🏹With MCON's Kulafu Bois
21/07/2023

Team Pana 🏹

With MCON's Kulafu Bois

Successful Ground Breaking Ceremony.Proposed 3-Storey Residential Building with Roof Deck.Thank you for the trust Mr. In...
21/07/2023

Successful Ground Breaking Ceremony.
Proposed 3-Storey Residential Building with Roof Deck.

Thank you for the trust Mr. Inting.



☝️

Address

Cebu City
6000

Telephone

+639270392066

Website

Alerts

Be the first to know and let us send you an email when MCON posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to MCON:

Share