MORE Power

Directions Website Contact the business

MORE Power We desire to be the preferred electric distribution utility provider that responds to the dynamic needs of consumers and delivers competent energy solutions.

18/09/2026

MORE POWER SERVICE SEASON 9 EPISODE 12

๐๐†๐‚๐-๐’๐‚๐‡๐„๐ƒ๐”๐‹๐„๐ƒ ๐ˆ๐๐“๐„๐‘๐‘๐”๐๐“๐ˆ๐Ž๐: ๐’๐„๐๐“๐„๐Œ๐๐„๐‘ ๐Ÿ๐Ÿ—, ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ” (CANCELLED) Kanselado ang nauna nga ginpangabay sang National Grid Corpo...
18/09/2026

๐๐†๐‚๐-๐’๐‚๐‡๐„๐ƒ๐”๐‹๐„๐ƒ ๐ˆ๐๐“๐„๐‘๐‘๐”๐๐“๐ˆ๐Ž๐: ๐’๐„๐๐“๐„๐Œ๐๐„๐‘ ๐Ÿ๐Ÿ—, ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ” (CANCELLED)

Kanselado ang nauna nga ginpangabay sang National Grid Corporation of the Philippines (NGCP) nga 12 ka oras nga Scheduled Power Interruption sa franchise area sang MORE Power para sa patigayunon nga maintenance work kag pag-ugrade sang ila nga Iloilo Substation sa Setyembre 19, 2026, Sabado nga adlaw.

Indi man madayon ang patigayunon kun tani sang MORE Power nga mga clearing operations kag rehabilitations works sa mga linya sini sa kapareho nga adlaw.

Ginpadala ang opisyal nga komunikasyon nga kanselado ang nasambit nga schedule power interruption subong nga adlaw, September 18, 2026.

Liwat nga magahatag sang bag-o nga schedule ang NGCP kun san-o ini dayunon.

Salamat sa inyo padayon nga suporta kag paghangop.

18/09/2026

GRID ALERT STATUS
as of 18 September 2026, 7:30AM

All grids are on NORMAL operating condition today, based on current supply and demand forecast.

In the Visayas, grid conditions improved with increased generation capacity from Mindanao (TSI 1 and GNPK 2 back online) resulting in the full 450MW being exported to Visayas through the MVIP. However, a major plant outage may still trigger a Yellow Alert.

Visayas
Available Capacity - 2,672MW
Peak Demand - 2,308MW


๐Œ๐Ž๐‘๐„ ๐๐Ž๐–๐„๐‘ ๐’๐‚๐‡๐„๐ƒ๐”๐‹๐„๐ƒ ๐๐Ž๐–๐„๐‘ ๐ˆ๐๐“๐„๐‘๐‘๐”๐๐“๐ˆ๐Ž๐Nagapahibalo ang MORE Power nga may yara sang scheduled power interruption nga pa...
17/09/2026

๐Œ๐Ž๐‘๐„ ๐๐Ž๐–๐„๐‘ ๐’๐‚๐‡๐„๐ƒ๐”๐‹๐„๐ƒ ๐๐Ž๐–๐„๐‘ ๐ˆ๐๐“๐„๐‘๐‘๐”๐๐“๐ˆ๐Ž๐

Nagapahibalo ang MORE Power nga may yara sang scheduled power interruption nga patigayunon sa September 20, 2026 (Dominggo)

Magapatigayon sang reconductoring sang 13.2 kV nga linya kun sa diin islan sang ini sang tree wire. Ini agud malikawan ang unscheduled interruption sa mga paalabuton nga tini-on.

Gilayon nga ibalik ang supply sang kuryente pagkatapos ang mga scheduled works. Sa dugang nga impormasyon, magtawag sa amon 24/7 helpline numbers ( 033) 526-MORE (6673) kag 09-17-557-6130 ukon mag send sang message sa amon facebook MORE Power.

Mag-contact sa customer service sang MORE Power kag ihatag ang account number agud matumod kun sa diin nga oras kag bahin sang feeder nalakip ang imo lugar.

Yari ang mga lugar nga apektado nga feeders:

๐Ÿ•ฐ๏ธ๐Ÿ•:๐ŸŽ๐ŸŽ ๐€๐Œ - ๐Ÿ๐Ÿ:๐ŸŽ๐ŸŽ ๐๐Œ (5 hours)
>Portion of Lapaz Feeder 2
โ€ขPortion of Bito-on, Jaro

๐Ÿ•ฐ๏ธ ๐Ÿ•:๐ŸŽ๐ŸŽ ๐€๐Œ -๐Ÿ•:๐Ÿ๐Ÿ“ ๐€๐Œ ๐š๐ง๐ ๐Ÿ๐Ÿ:๐Ÿ’๐Ÿ“ ๐€๐Œ- ๐Ÿ๐Ÿ:๐ŸŽ๐ŸŽ ๐๐Œ (30 minutes)
>Portion of Lapaz F2
โ€ขJaro District
*Whole of Barangays*
Buntatala
Lanit
Tagbak
Portion of Barangays
Balabago
Balantang
Bito-on

Gilayon ibalik ang supply sang kurtente pagkatapos sang rehabilitation works.

Salamat sa inyo padayon nga suporta kag paghangop.

๐„๐Œ๐„๐‘๐†๐„๐๐‚๐˜ ๐๐Ž๐–๐„๐‘ ๐ˆ๐๐“๐„๐‘๐‘๐”๐๐“๐ˆ๐Ž๐: ๐Œ๐€๐๐”๐€๐‹ ๐‹๐Ž๐€๐ƒ ๐ƒ๐‘๐Ž๐๐๐ˆ๐๐† ๐๐˜ ๐๐†๐‚๐Date: Thursday, September 17, 2026As of 7:00 PM, we have not r...
17/09/2026

๐„๐Œ๐„๐‘๐†๐„๐๐‚๐˜ ๐๐Ž๐–๐„๐‘ ๐ˆ๐๐“๐„๐‘๐‘๐”๐๐“๐ˆ๐Ž๐: ๐Œ๐€๐๐”๐€๐‹ ๐‹๐Ž๐€๐ƒ ๐ƒ๐‘๐Ž๐๐๐ˆ๐๐† ๐๐˜ ๐๐†๐‚๐

Date: Thursday, September 17, 2026

As of 7:00 PM, we have not received any further advisory from the National Grid Corporation of the Philippines (NGCP) regarding the implementation of Manual Load Dropping (MLD) and possible rotational brownouts within our franchise area, following their earlier notice this evening.

However, as of this time, power supply within our franchise area has normalized.

MORE Power continues to closely monitor the situation and coordinate with NGCP to help maintain system stability and reliable electricity service for our consumers.

We will provide further updates should there be any significant developments.

Thank you for your patience, understanding and cooperation.

๐Œ๐Ž๐‘๐„ ๐๐Ž๐–๐„๐‘ ๐€๐ƒ๐•๐ˆ๐’๐Ž๐‘๐˜: ๐๐†๐‚๐ ๐˜๐„๐‹๐‹๐Ž๐– ๐€๐‹๐„๐‘๐“Date: Thursday, September 17, 2026Ang Visayas Grid may kakulangan nga 820.6MW nga ...
17/09/2026

๐Œ๐Ž๐‘๐„ ๐๐Ž๐–๐„๐‘ ๐€๐ƒ๐•๐ˆ๐’๐Ž๐‘๐˜: ๐๐†๐‚๐ ๐˜๐„๐‹๐‹๐Ž๐– ๐€๐‹๐„๐‘๐“

Date: Thursday, September 17, 2026

Ang Visayas Grid may kakulangan nga 820.6MW nga kuryente subong nga adlaw base sa NGCP.

Bangud sa indi pag-operate sang pila ka daku nga power plants sa Visayas kag limitado nga kuryente nga halin sa Mindanao, nagnubo ang available nga power supply sa Visayas Grid.

Suno sa NGCP, ang Visayas Grid yara sa:

๐ŸŸก YELLOW ALERT: 5:00 PM โ€“ 7:00 PM

Bangud sini, magapatuman ang NGCP sang Manual Load Dropping (MLD) para mapabilin nga stable kag masaligan ang power grid. Ini mahimo magresulta sa temporaryo nga pagkawala sang kuryente sa pila ka lugar sa franchise area ni MORE Power.

Sa subong, indi pa maka-post ang MORE Power sang mga feeders nga posible maapektuhan. Magadepende ini sa load reduction nga ipangayo sang NGCP.

Padayon kami nga naga-monitor kag coordinate sa NGCP para makahatag sang update sa gilayon kung may bag-o nga impormasyon.

Nagapangayo kami sang inyo pasensya, paghangop, kag kooperasyon. Salamat.

To know more about MLD: https://www.facebook.com/watch/?ref=search&v=651655406105656&external_log_id

17/09/2026

VISAYAS GRID ALERT STATUS
Update as 17 September 2026, 8AM

Yellow Alert
5:00PM- 7:00PM

Available Capacity - 2,505MW
Peak Demand - 2,290MW

12 plants are on forced outage on September, 3 plants since August 2026, 1 plant since July, 2 plants since June, 7 plants since May, 3 plants since 2025, 2 plants since 2024, 2 plants since 2023, and 1 plant since 2021, while 14 plants are running on derated capacities, for a total of 820.6MW unavailable to the grid.

Factor/s that contributed to the YELLOW Alert declaration:

1. Unavailability of Visayas' large coal plants TVI 1 and PEDC 3
๏ฟฝ2. Limited power import from the Mindanao Grid

A yellow alert is issued when the operating margin is insufficient to meet the transmission gridโ€™s contingency requirement.


๐๐†๐‚๐-๐’๐‚๐‡๐„๐ƒ๐”๐‹๐„๐ƒ ๐ˆ๐๐“๐„๐‘๐‘๐”๐๐“๐ˆ๐Ž๐: ๐’๐„๐๐“๐„๐Œ๐๐„๐‘ ๐Ÿ๐Ÿ—, ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ”Nagpangabay ang National Grid Corporation of the Philippines (NGCP) sang ...
16/09/2026

๐๐†๐‚๐-๐’๐‚๐‡๐„๐ƒ๐”๐‹๐„๐ƒ ๐ˆ๐๐“๐„๐‘๐‘๐”๐๐“๐ˆ๐Ž๐: ๐’๐„๐๐“๐„๐Œ๐๐„๐‘ ๐Ÿ๐Ÿ—, ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ”

Nagpangabay ang National Grid Corporation of the Philippines (NGCP) sang 12 ka oras nga Scheduled Power Interruption sa franchise area sang MORE Power para sa patigayunon nga maintenance work kag pag-ugrade sang ila nga Iloilo Substation sa Setyembre 19, 2026, Sabado nga adlaw.

Madumduman nga gin-ipaiway ang nasambit schedule interruption nga kun tani patigayunon sang Agosto 30, 2026.

Kadungan sini, mapatigayon ang MORE Power sang mga clearing operations kag rehabilitations works sa mga linya sini agud malikawan man ang unscheduled interruption sa mga paalabuton nga tini-on.

Gilayon nga ibalik ang supply sang kuryente pagkatapos ang mga scheduled works. Sa dugang nga impormasyon, magtawag sa amon 24/7 helpline numbers ( 033) 526-MORE (6673) kag 09-17-557-6130 ukon mag send sang message sa amon facebook MORE Power.

Mag-contact sa customer service sang MORE Power kag ihatag ang account number agud matumod kun sa diin nga oras kag bahin sang feeder nalakip ang imo lugar.

Please note that the additional two-hour allowance in NGCPโ€™s schedule is needed to complete the necessary steps and safely stabilize the power supply before restoring electricity to affected areas. We will energize and restore power as soon as it is safe and possible to do so.

Yari ang mga lugar nga apektado nga feeders:
NGCP Scheduled Request

๐Ÿ•ฐ๏ธ๐Ÿ“:๐ŸŽ๐ŸŽ ๐€๐Œ - ๐Ÿ•:๐ŸŽ๐ŸŽ ๐๐Œ (๐Ÿ๐Ÿ’ ๐ก๐จ๐ฎ๐ซ๐ฌ)
โ€ขWhole of Arevalo Feeders 1 and 2
โ€ขWhole of Diversion Feeders 2,3 and 4
โ€ขWhole of Mandurriao Feeder 4
โ€ขWhole of Megaworld Feeder 3 and Feeder 6
โ€ขWhole of Mobile Feeders 2,3 and 4
โ€ขWhole of Molo Feeders 1,2,3,4 and 5

โ€ขPortion of Diversion Feeder 1 & Mobile Feeder 5
*Portion of Barangays*
Inday, City Proper
San Agustin, City Proper
San Felix, City Proper
Villa Anita, City Proper
Montinola, Jaro
Our Lady of Lourdes, Jaro
Bantud, Lapaz
Magsaysay Village, Lapaz
Nabitasan, Lapaz
San Nicolas, Lapaz
Taal, Molo

๐Ÿ•ฐ๏ธ ๐Ÿ“:๐ŸŽ๐ŸŽ ๐€๐Œ-๐Ÿ–:๐ŸŽ๐ŸŽ ๐€๐Œ & ๐Ÿ“:๐ŸŽ๐ŸŽ ๐๐Œ-๐Ÿ•:๐ŸŽ๐ŸŽ ๐๐Œ (๐Ÿ“ ๐ก๐จ๐ฎ๐ซ๐ฌ)
โ€ขWhole of Jaro Feeders 1 & 2
โ€ขWhole of Megaworld Feeder 1,2 & 4

โ€ขPortion of Diversion Feeder 1 & Mobile Feeder 5
โ€ขWhole of Barangay Magdalo, Lapaz

*Portion of Barangays*
Danao, City Proper
Ed Ganzon, City Proper
Kauswagan, City Proper
Roxas Village, City Proper
Sampaguita, City Proper
San Agustin, City Proper
Javellana, Jaro
San Jose, Jaro
San Pedro, Jaro
Bantud, Lapaz
Burgos-Mabini, Lapaz
Jereos, Lapaz
Laguda, Lapaz
Luna, Lapaz
Magsaysay Village, Lapaz
Nabitasan, Lapaz
Railway, Lapaz
San Nicolas, Lapaz

More Power Ride-on works
๐Ÿ•ฐ๏ธ ๐Ÿ“:๐ŸŽ๐ŸŽ ๐€๐Œ - ๐Ÿ•:๐ŸŽ๐ŸŽ ๐๐Œ (๐Ÿ๐Ÿ’ ๐ก๐จ๐ฎ๐ซ๐ฌ)
โ€ขPortion of Lapaz Feeder 1

>Lapuz District
*Whole of Barangays*
Bo. Obrero
Jalandoni Estate
Lapuz, Norte
Libertad
Mansaya
Progreso
*Portion of Barangays*
Alalasan
Don Esteban
Lapuz Sur
Loboc
Punong
Sinikway

>Lapaz District
Portion of Baldoza
Portion of Ingore

>City Proper District
Portion of Danao
Portion of Ed Ganzon

๐Ÿ•ฐ๏ธ ๐Ÿ“:๐ŸŽ๐ŸŽ ๐€๐Œ-๐Ÿ”:๐Ÿ‘๐ŸŽ ๐€๐Œ & ๐Ÿ“:๐Ÿ‘๐ŸŽ ๐๐Œ-๐Ÿ•:๐ŸŽ๐ŸŽ ๐๐Œ (๐Ÿ‘ ๐ก๐จ๐ฎ๐ซ๐ฌ)
โ€ขWhole of Lapaz F5
โ€ขPortion of Lapaz F1
>City Proper District
Portion of Barangays
Arsenal-Aduana
Ed Ganzon
Kauswagan
Magsaysay
Nonoy
Sampaguita
Yulo-Arroyo

Ginapasiguro naton nga gilayon ibalik ang supply sang kuryente kun timprano nga matapos ang scheduled maintenance.

Salamat sa inyo padayon nga suporta kag paghangop.

16/09/2026

๐„๐Œ๐„๐‘๐†๐„๐๐‚๐˜ ๐๐Ž๐–๐„๐‘ ๐ˆ๐๐“๐„๐‘๐‘๐”๐๐“๐ˆ๐Ž๐: ๐Œ๐€๐๐”๐€๐‹ ๐‹๐Ž๐€๐ƒ ๐ƒ๐‘๐Ž๐๐๐ˆ๐๐† ๐๐˜ ๐๐†๐‚๐

Date: September 16, 2026 (Wednesday)

We would like to inform our customers that NGCP has advised us to load up the feeders that were previously deloaded due to the earlier supply deficiency.

๐๐จ๐ฐ๐ž๐ซ ๐ก๐š๐ฌ ๐›๐ž๐ž๐ง ๐ซ๐ž๐ฌ๐ญ๐จ๐ซ๐ž๐ ๐ข๐ง ๐ญ๐ก๐ž ๐Ÿ๐จ๐ฅ๐ฅ๐จ๐ฐ๐ข๐ง๐  ๐š๐ซ๐ž๐š๐ฌ:

Update as of 6:13 PM
๐„๐ง๐ž๐ซ๐ ๐ข๐ณ๐ž๐ ๐…๐ž๐ž๐๐ž๐ซ/๐ฌ:

โ€ข ๐‰๐€๐‘๐Ž ๐…๐„๐„๐ƒ๐„๐‘ ๐Ÿ
- offline as of 6:07 PM โŒ
- online as of 6:13 PM โœ…

โ€ข ๐Œ๐Ž๐๐ˆ๐‹๐„ ๐…๐„๐„๐ƒ๐„๐‘ ๐Ÿ“
- offline as of 6:09 PM โŒ
- online as of 6:12 PM โœ…

We are closely coordinating with NGCP and will continue to monitor the power supply to ensure stability in the affected areas.

We appreciate your patience, understanding, and cooperation.

16/09/2026

๐„๐Œ๐„๐‘๐†๐„๐๐‚๐˜ ๐๐Ž๐–๐„๐‘ ๐ˆ๐๐“๐„๐‘๐‘๐”๐๐“๐ˆ๐Ž๐: ๐Œ๐€๐๐”๐€๐‹ ๐‹๐Ž๐€๐ƒ ๐ƒ๐‘๐Ž๐๐๐ˆ๐๐† ๐๐˜ ๐๐†๐‚๐

Date: September 16, 2026 (Wednesday)

As of 6:00 PM, We have received information from NGCP to implement MLD. Please be informed that the feeders listed below are currently affected by NGCP's Manual Load Dropping (MLD) due to a supply deficiency:

Customers in these areas will experience power interruptions lasting ๐š๐ฉ๐ฉ๐ซ๐จ๐ฑ๐ข๐ฆ๐š๐ญ๐ž๐ฅ๐ฒ ๐Ÿ ๐ก๐จ๐ฎ๐ซ.

Update as of 6:09 PM
๐‚๐ฎ๐ซ๐ซ๐ž๐ง๐ญ๐ฅ๐ฒ ๐จ๐Ÿ๐Ÿ๐ฅ๐ข๐ง๐ž:

โ€ข ๐‰๐€๐‘๐Ž ๐…๐„๐„๐ƒ๐„๐‘ ๐Ÿ
- offline as of 6:07 PM โŒ

โ€ข ๐Œ๐Ž๐๐ˆ๐‹๐„ ๐…๐„๐„๐ƒ๐„๐‘ ๐Ÿ“
- offline as of 6:09 PM โŒ

We are closely coordinating with NGCP and will provide updates as soon as additional information becomes available.

We appreciate your understanding and cooperation.

Address

GST Corporate Bldg. Quezon Street
Iloilo City
5000

Alerts

Be the first to know and let us send you an email when MORE Power posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to MORE Power:

Shortcuts

Share

Category