𝐓𝐨 𝐞𝐧𝐬𝐮𝐫𝐞 𝐜𝐨𝐧𝐬𝐢𝐬𝐭𝐞𝐧𝐭 𝐰𝐚𝐭𝐞𝐫 𝐩𝐫𝐞𝐬𝐬𝐮𝐫𝐞 𝐚𝐧𝐝 𝐬𝐲𝐬𝐭𝐞𝐦 𝐫𝐞𝐥𝐢𝐚𝐛𝐢𝐥𝐢𝐭𝐲. 𝐑𝐞𝐠𝐮𝐥𝐚𝐫 𝐢𝐧𝐬𝐩𝐞𝐜𝐭𝐢𝐨𝐧 𝐡𝐞𝐥𝐩 𝐦𝐚𝐢𝐧𝐭𝐚𝐢𝐧 𝐞𝐟𝐟𝐢𝐜𝐢𝐞𝐧𝐜𝐲 𝐚𝐧𝐝 𝐩𝐫𝐞𝐯𝐞𝐧𝐭 𝐮𝐧𝐞𝐱𝐩𝐞𝐜𝐭𝐞𝐝 𝐟𝐚𝐢𝐥𝐮𝐫𝐞𝐬. 💧🔧

𝐈𝐧𝐬𝐩𝐞𝐜𝐭𝐢𝐨𝐧:
• Check air pre-charge pressure.
• Inspect air valve for leaks.
• Verify tank exterior for corrosion or rust.
• Check for water discharge from air valve (indicates ruptured bladder).
• Confirm tank size is appropriate for system demand.

𝐈𝐧𝐢𝐭𝐢𝐚𝐥 𝐑𝐞𝐜𝐨𝐦𝐦𝐞𝐧𝐝𝐚𝐭𝐢𝐨𝐧𝐬:
• Maintain pre-charge pressure slightly below pump cut-in pressure.
• Replace damaged bladder or diaphragm.
• Replace tank if corrosion or structural damage is found.

𝐒𝐄𝐑𝐕𝐈𝐂𝐄𝐒 𝐖𝐄 𝐎𝐅𝐅𝐄𝐑:
✔️𝐃𝐄𝐒𝐈𝐆𝐍 — Complete Set of Plans (𝐒𝐈𝐆𝐍𝐄𝐃 & 𝐒𝐄𝐀𝐋𝐄𝐃)
✔️𝐁𝐔𝐈𝐋𝐃 — Renovation, Extension & New house/Bldg.
✔️𝐄𝐍𝐆𝐈𝐍𝐄𝐄𝐑𝐈𝐍𝐆 — Structural, Plumbing & Electrical Repairs

𝐅𝐎𝐑 𝐈𝐍𝐐𝐔𝐈𝐑𝐈𝐄𝐒:
☎𝟎𝟗𝟔𝟓-𝟒𝟏𝟔-𝟕𝟔𝟎𝟔
💌𝐚𝐦𝐥𝐜𝐨𝐧𝐬𝐜𝐨𝐫𝐩@𝐠𝐦𝐚𝐢𝐥.𝐜𝐨𝐦
📍𝟓𝐅 𝐏𝐡𝐢𝐧𝐦𝐚 𝐏𝐥𝐚𝐳𝐚, 𝟑𝟗 𝐃𝐫𝐢𝐯𝐞, 𝐑𝐨𝐜𝐤𝐰𝐞𝐥𝐥 𝐂𝐞𝐧𝐭𝐞𝐫, 𝐌𝐚𝐤𝐚𝐭𝐢 𝐂𝐢𝐭𝐲

17/02/2026

Another plumbing repair done right — built to last, not just to pass. 🛠️⚙️

FOR INQUIRIES:
📞0965-416-7606
📧[email protected]
📍5f Phinma Plaza, 39 Drive, Rockwell Center, Makati City

.

Address

5F, Phinma Plaza, 39 Plaza Drive, Rockwell Center
Makati
1200

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm
Saturday 8am - 5pm

Website

Alerts

Be the first to know and let us send you an email when ALCON posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share