J.Abrio Engineering Services.

J.Abrio Engineering Services. DESIGN AND BUILD

ANOTHER NEW CONSTRUCTION PROJECT 🔨🔨Proposed Three Storey Residence 🏠Location: Mapalad st. Tonsuya Malabon cityConstructi...
13/06/2026

ANOTHER NEW CONSTRUCTION PROJECT 🔨🔨

Proposed Three Storey Residence 🏠
Location: Mapalad st. Tonsuya Malabon city

Construction progress:
- on going clearing, demolition and dismantling of existing structure.



- - -
For Inquiries, PM us 😊

We offer,
- Complete Set of drawing plan for building, renovation, demolition and fencing permit
- Sign and seal of Plans and permit
- cost estimate
- Construction and renovation

God bless 😊

CONSTRUCTION UPDATE  as of June 8, 2026 on our Proposed Two Storey Residence at Talipapa Caloocan city 🏠Construction pro...
08/06/2026

CONSTRUCTION UPDATE as of June 8, 2026 on our Proposed Two Storey Residence at Talipapa Caloocan city 🏠

Construction progress - ON GOING:
- Wall plastering (interior & exterior)
- Installation of ceiling
- Painting works
- Kitchen works
- waterproofing @ second floor toilet
- tile works
- Door finishing
- electrical works (wiring)



- - -
For Inquiries, PM us 😊

We offer,
- Complete Set of drawing plan for building, renovation, demolition and fencing permit
- Sign and seal of Plans and permit
- cost estimate
- Construction and renovation

God bless 😊

Construction update on our Proposed Two Storey Residence at Talipapa Caloocan city 🏠Construction progress - ON GOING: - ...
16/05/2026

Construction update on our Proposed Two Storey Residence at Talipapa Caloocan city 🏠

Construction progress - ON GOING:
- Wall plastering (Interior and exterior)
- installation of roof and accessories
- Painting works
- Installation of Door Jamb
- Purchased materials (Tiles, wooden doors, skim coat, CHB, cement, Upvc doors and windows, Roofing materials)



- - -
For Inquiries, PM us 😊

We offer,
- Complete Set of drawing plan for building, renovation, demolition and fencing permit
- Sign and seal of Plans and permit
- cost estimate
- Construction and renovation

God bless 😊

Construction update on our Proposed Two Storey Residence at Talipapa Caloocan city 🏠Construction progress: - suspended s...
09/04/2026

Construction update on our Proposed Two Storey Residence at Talipapa Caloocan city 🏠

Construction progress:
- suspended slab Concrete pouribg using Line pump and ready mix concrete.

We choose to pour a pumpcrete concrete design with a strength of 3000Psi at 14 days.

After finishing the concrete slab, our next step is to build the roof and start putting up the walls. Slowly but surely, we’re getting closer to a complete structure.



- - -
For Inquiries, PM us 😊

We offer,
- Complete Set of drawing plan for building, renovation, demolition and fencing permit
- Sign and seal of Plans and permit
- cost estimate
- Construction and renovation

God bless 😊

FINISHED PROJECT ❤DEMOLITION PERMIT REQUIREMENTS March 14, 2026PROJECT: Demolition of Existing Two Storey  Residential S...
14/03/2026

FINISHED PROJECT ❤
DEMOLITION PERMIT REQUIREMENTS

March 14, 2026

PROJECT: Demolition of Existing Two Storey Residential Structure
LOCATION: Mapalad St. Tonsuya Malabon City

Purpose: For demolition permit
Preparation for building permit and Construction

DOCUMENTS: (SIGNED AND SEALED)

- 4 sets Building footprint
- 4 sets of Demolition Permit
- 3 sets of Demolition Cost
- 3 Sets of Demolition Procedure
- 2 copies - PTR & PRC

----------
FOR YOUR INQUIRIES, PM us!

We offer,
- Complete set of plans for building, renovation, fencing etc permits
- Sign and seal of plans and permits
- renovation and construction
- cost estimates
- exterior and interior designs

God bless everyone ❤️

OCULAR INSPECTION FOR INDEX CARWASH AND GARAGE WITH TWO STOREY RESTOBARFebruary 15, 2026Location: 6 sct albano, Panay av...
01/03/2026

OCULAR INSPECTION FOR INDEX CARWASH AND GARAGE WITH TWO STOREY RESTOBAR

February 15, 2026
Location: 6 sct albano, Panay avenue, diliman, Quezon city

Scope of works:
✅ Structural recalculation
✅ Retrofitting works

During inspection, a sagging steel beam was observed. Further structural evaluation is being conducted to determine the cause and recommend the appropriate corrective measures to ensure safety and structural integrity.



Thank you for trusting us!

- - -
For Inquiries, PM us 😊

We offer,
- Complete Set of drawing plan for building, renovation, demolition and fencing permit
- Sign and seal of Plans and permit
- cost estimate
- Construction and renovation

God bless 😊

FINISHED PROJECT DESIGNAS BUILT PLAN ❗❗❗February 24, 2026PROJECT: AS BUILT PLAN OF PREMIER VETERINARY CLINICLOCATION: La...
24/02/2026

FINISHED PROJECT DESIGN
AS BUILT PLAN ❗❗❗
February 24, 2026

PROJECT: AS BUILT PLAN OF PREMIER VETERINARY CLINIC
LOCATION: Laguna Central Sta. Rosa Laguna

Purpose: Occupancy permit Application

DOCUMENTS: (SIGNED AND SEALED)

- 5 sets of Complete Set of AS BUILT Plans (Architectural, electrical, Plumbing, Mechanical, Fire Pro, Electronics)
- 5 copies of Certificate of Completion
- 3 sets Unified Application for occupancy permit
- 3 copies of PTR AND PRC (all professionals)
- Construction Logbook

----------
FOR YOUR INQUIRIES, PM us!

We offer,
- Complete set of plans for building, renovation, fencing etc permits
- Sign and seal of plans and permits
- renovation and construction
- cost estimates
- exterior and interior designs
God bless everyone ❤️

Address

2 Pinagpala Street Tonsuya
Malabon
1473

Website

Alerts

Be the first to know and let us send you an email when J.Abrio Engineering Services. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to J.Abrio Engineering Services.:

Shortcuts

Share