Engr Joan

Engr Joan Structural Design
Engineering
Sign and Seal
Safety Officer II

makati base ● metro manila Engineering & Construction

DRAWING TIP: in drawings, WF Wall footings should always connect to the beam, ok? end walls should terminate in a column
08/02/2026

DRAWING TIP: in drawings, WF Wall footings should always connect to the beam, ok? end walls should terminate in a column

01/12/2025
01/12/2025
01/12/2025
22/10/2025

Calling all interested bidders!

The Bases Conversion and Development Authority (BCDA) invites interested participants to join the Bidding for the Design and Build of the National Sports Academy (NAS) - Phase 3 at New Clark City.

The BCDA will hold a Pre-bid Conference on 27 October 2025, 10:00 AM, at BCDA Corporate Center, 2nd Floor, Bonifacio Technology Center, 31st Street corner 2nd Avenue, Bonifacio Global City, Taguig City and/or through video conferencing via Zoom, https://bcda-gov-ph.zoom.us/j/81823554564?pwd=DVeRILzLPOe5kwWo1Swxcdve7E4DnP.1 .

For more details, please check the BCDA website at bcda.gov.ph.

04/08/2025

Drain Pipe in Retaining Wall – Why Needed....
Why are drain pipes essential in retaining walls?
They help release water pressure that builds up behind the wall during rain or groundwater movement.
Without drainage, hydrostatic pressure can cause cracks or complete wall failure.
✅ Use PVC drain pipes or weep holes
✅ Add gravel + geotextile for proper filtration
✅ Place drains at the bottom rear with slope

Drainage = Strength + Safety

04/08/2025

Address

Manila
1203

Alerts

Be the first to know and let us send you an email when Engr Joan posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Engr Joan:

Share