02/06/2025
DARMA Team site visit on Magat Dam.
The DARMA Team, in coordination with NIA Central Office - Design and Specifications Division (DSD) and Irrigation Engineering Center (IEC), NIA MARIIS Head Office - Engineering and Operations Division (EOD), and NIA MARIIS DRD - Flood Forecasting and Instrumentation Section (FFIS) and Civil Works Section (CWS), conducted a visual surveillance inspection of the Magat Dam on May 20–21, 2025. The activity aimed to assess the current condition of the embankment dam, focusing on its safety and structural stability.