Tuzon Construction

Tuzon Construction Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Tuzon Construction, Construction Company, Unit 3B, Co. Creators Building, #61 Liamzon Street, Midtown Subdivision Phase 3, San Roque, Marikina City.

We strictly adhere to the ethical standards set by the industry by achieving our vision through total service satisfaction to our clients in terms of service delivery and quality of work

19/10/2020

Have a nice day to all…..

The IHI Infrastructure System Co., Ltd. is in needs of the following position for the MANILA PRIORITY BRIDGES SEISMIC IMPROVEMENT PROJECT.

1. Driver
2. Health Personnel / First Aider
3. Doctor
4. Nurse
5. Office Cleaner

Working location: Construction Site of Lambingan Bridge and/or Guadalupe Bridge
Please send your Resume and Expected Salary to [email protected] in order to evaluate and send to IHI Management Philippines.
Thank you…..

19/10/2020

Have a nice day to all…..

The IHI Infrastructure System Co., Ltd. are in needs of the following position for the MANILA PRIORITY BRIDGES SEISMIC IMPROVEMENT PROJECT.

1. Foreman
2. Skilled Worker
3. Semi-skilled worker
4. General Worker(Helper)
5. Welder
6. Painter
7. Carpenter
8. Finishing Mason (Plastering)
9. Operator (Crane, JCB, Shovel, Bobcat, Manlift)
10. Driver

Working location: Construction Site of Lambingan Bridge and/or Guadalupe Bridge
Please send us a message with your personal details in order to evaluate and send to IHI Management Philippines

Thank you......

19/10/2020

Have a nice day to all…..

The IHI Infrastructure System Co., Ltd. are in needs of the following position for the MANILA PRIORITY BRIDGES SEISMIC IMPROVEMENT PROJECT.

1. Administrator
2. Accountant
3. Document Controller
4. QS Engineer
5. Schedule Controller by MS Project
6. Contract Engineer
7. Design Engineer
8. Electrical Engineer
9. IT Engineer
10. CAD Operator
11. Civil Site Engineer
12. Steel Fabrication Engineer
13. QA/QC Engineer
14. Safety Engineer
15. Safety Officer
16. Environmental Engineer
17. Traffic Control Management Staff

Working location: Construction Site of Lambingan Bridge and/or Guadalupe Bridge
The above positions are directly under the management of IHI Infrastructure System Co., Ltd.
Please send your Resume and Package Salary to [email protected] in order to evaluate and send to IHI Management Philippines.

Thank You!!!

12/09/2020
Ongoing Project!!Three Storey Residential BuildingLocation: Vista Verde Executive Village, Cainta RizalLot Area: 296 sqm...
10/09/2020

Ongoing Project!!

Three Storey Residential Building
Location: Vista Verde Executive Village, Cainta Rizal
Lot Area: 296 sqm
Floor Area: 480 sqm
Designed by: Architect Joel T. Angeles

OUR SERVICES:
♦ Architectural designs ( interior & exterior )
♦ Complete Set of Plan for Warehouse, Residential and Commercial Building.
♦ Structural Design and Analysis
♦ Bill of Quantities and Estimates
♦ Renovation and Fit Out Works of Residential and Commercial Building
♦ Electrical and Plumbing Works

--Complete Signed and Sealed by all Professions
--All complete requirements for submission for Building Permit, Bank Loan and Pag-Ibig Loan.

Your choice for beauty, affordability, quality of works and safe & sound structures

♦♦residentialcommercialbldgdesign---warehousedesign---construction♦♦

Ongoing Project!!Site DevelopmentScope of Work – Back Filling, Compaction, Rip Rap and Concrete FenceLocation: AntipoloL...
10/09/2020

Ongoing Project!!

Site Development
Scope of Work – Back Filling, Compaction, Rip Rap and Concrete Fence
Location: Antipolo
Lot Area: 1.6 Hectares

OUR SERVICES:
♦ Architectural designs ( interior & exterior )
♦ Complete Set of Plan for Warehouse, Residential and Commercial Building.
♦ Structural Design and Analysis
♦ Bill of Quantities and Estimates
♦ Renovation and Fit Out Works of Residential and Commercial Building
♦ Electrical and Plumbing Works

--Complete Signed and Sealed by all Professions
--All complete requirements for submission for Building Permit, Bank Loan and Pag-Ibig Loan.

Your choice for beauty, affordability, quality of works and safe & sound structures!!

♦♦residentialcommercialbldgdesign---warehousedesign---construction♦♦

Address

Unit 3B, Co. Creators Building, #61 Liamzon Street, Midtown Subdivision Phase 3, San Roque
Marikina City

Website

Alerts

Be the first to know and let us send you an email when Tuzon Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Tuzon Construction:

Share