20/10/2025
Renovation of 110sq. meter residential building completed in just 100 days!
â—Ź TERMITE CONTROL
â—Ź Installation of Water System
▪︎ Made in Italy water pump
▪︎ PPR Pipes (Green Pipe)
▪︎ Signature Stainless Tank
▪︎ Bladder Type Tank Support
â—Ź Deconstruction/Dismantling of Existing Old Roof
• Reconstruction/Replacement of New Roofing Materials
- 0.6mm Roof Sheets
- C-Purlins
- Tubular
- Roof Flashing
- Water Proofing
• Improvement of Ceiling
- Installation of new ceiling boards at decayed portion
- Installation of Pin Lights
- Installation of Cove Light
• Repair and replacement of Electrical Wirings and devices
- New outlets
- New light switches
• Installation of New Door Jamb, New Panel Doors, repair, revarnishing.
• Uninstallation and Reinstallation of Aluminum Doors for 3 C.R.
• Uninstallation and Reinstallation of 1 Aluminum Screen Door for Front Door
• Uninstallation and Reinstallation of 2 Large Windows
• Deconstruction and Construction of Main Gate (Fabrication and Installation)
• Painting of outdoor rubberize paint front garage.
• Dismantling of Old Wood Parquet.
• Installation of New Tiles at Second Floor Level
• Polishing of Existing Tiles at Ground Floor Level
• Removal of existing Cabinets
• Installation of New Cabinets
• Restoration of 2 Comfort Rooms and 1 Pantry room
- New Tiles
- New Water Closet and Lavatory
- Water Proofing
• Repair of Stairs
- Removal of Existing wood planks
- Installation of tiles
• Improvement of Façade
- Stripping of exterior paint
- Repainting
- Installation of Accessories, if applicable
• Stripping of Interior Paint
• Repainting of Walls and Ceiling