JSCR Solar Panel Installation Services

JSCR Solar Panel Installation Services Let the sun pay your bills. page of JSCR Solar Panel Installation Services
✅ DTI Registered
✅ BIR Registered
✅ with Service Invoice/Official Receipt

Copyright sa owner
14/05/2026

Copyright sa owner

NGCP Manual Load Dropping? Rotational Brownout?Mafi-feel mo agad na sulit ang pagpakabit mo ng solar sa mga ganitong sit...
14/05/2026

NGCP Manual Load Dropping? Rotational Brownout?

Mafi-feel mo agad na sulit ang pagpakabit mo ng solar sa mga ganitong sitwasyon. 👌🏻

Invest on clean energy, invest on solar, and never worry on times like this.

Pm us for inquiries!

PM for Solar. Para kahit mag shut down si NGCP, di ka apektado ☀️⚡
14/05/2026

PM for Solar. Para kahit mag shut down si NGCP, di ka apektado ☀️⚡

LUZON GRID ALERT STATUS
as of 14 May 2026, 8:00AM

Red 𝐀𝐥𝐞𝐫𝐭
4:00PM-10:00PM

𝐘𝐞𝐥𝐥𝐨𝐰 𝐀𝐥𝐞𝐫𝐭
3:00PM-4:00PM
10:00PM-11:00PM

Available Capacity- 12,479MW
Peak Demand- 12,595MW

12 plants are on outage since May, 2 since April, 3 plants since March, 4 since January, 3 since 2025, 2 since 2024, and 1 plant out since 2019; while 14 plants are running on derated capacities, for a total of 4,242.5MW unavailable to the grid.

The Tayabas-Ilijan 500kV Line and the Dasmarinas-Ilijan 500kV Line were restored on 13 May 2026 at 2:44PM and 4:52PM, respectively. We are waiting for the affected plants to resynchronize back to the grid.

A red alert status is issued when power supply is insufficient to meet consumer demand and the transmission grid’s regulating requirement.

A yellow alert is issued when the operating margin is insufficient to meet the transmission grid’s contingency requirement.


13/05/2026

NGCP may implement Manual Load Dropping (MLD) in the following areas today, 13 May, to maintain the integrity of the power system:

LUZON
9PM-10PM
LUECO (parts of La Union)
ISECO (parts of Ilocos Sur)
CENPELCO (parts of Pangasinan)
ISELCO I (parts of Isabela)
QUIRELCO (entire province of Quirino)
BATELEC II (parts of Batangas
Ibaan Electric Corp. (parts of Batangas)
ALECO (parts of Albay)
PELCO (parts of Pampanga)
SFELAPCO (parts of Pampanga)
QUEZELCO 1 (parts of Quezon)
MERALCO (parts of Metro Manila)
NEECO I (parts of Nueva Ecija)
BATELEC I (parts of Batangas)

Schedule may be cancelled if system condition improves, such as if actual demand falls below projections.

NGCP encourages everyone to exercise prudence in using electricity.

Iba’t ibang uri ng solar connection ☀️⚡(1) GRID-TIED or ON-GRID Connection - directly connected to the utility power gri...
13/05/2026

Iba’t ibang uri ng solar connection ☀️⚡

(1) GRID-TIED or ON-GRID Connection - directly connected to the utility power grid. Solar powers your load and if there are excess energy, it goes to the grid. May supply parin sa utility kapag kulang na ang power from solar. Mas tipid kasi hindi kailangan ng battery. No power backup.

(2) OFF-GRID Connection - completely independent. Solar lang ang source of power mo. No more electric bill at all.

(3) HYBRID Connection - combination of the two mentioned above. May battery storage ka at may backup ka pa from utility kapag mahina ang charge ng solar.

Piliin ang system na swak sa budget, location, at needs mo. ☀️⚡️

Message us for FREE solar assessment 📩

Send us DM for your Inquiries ✅📩
10/05/2026

Send us DM for your Inquiries ✅📩



Address

Albay
Oas
4505

Website

Alerts

Be the first to know and let us send you an email when JSCR Solar Panel Installation Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share