Geodetic Engineers Forum

Geodetic Engineers Forum Geodetic Engineers Information Page

06/06/2026
29/04/2026

A proud milestone for Surveytech Corporation!

We are honored to announce the awarding of our ISO Certification—a testament to our commitment to quality, reliability, and continuous improvement.

The certificate was formally received by our Chairman, Mr. Gary Carpitanos, together with our President, Carlo Carpitanos.

This achievement reflects the collective dedication of our team in delivering trusted, high-precision surveying solutions.

Here’s to raising the bar and continuing to serve with excellence!

22/04/2026
13/04/2026

🔴 1. Failure to Notify Adjoining Owner

This is a direct violation of mandatory survey procedure

Legal / Manual Basis:
• Surveyors “shall give due notice in advance to the adjoining owners… of the date and hour of the survey.” 

• Also reflected in LMB practice (Survey Notification Letter – LMB Form GSD-E-3)
• Standard procedure requires written notice (usually 7–15 days before fieldwork) 

📌 Violation:

👉 Conducting survey without written notice to adjoining owner

⚖️ Nature of Violation:
• Violation of Land Surveyors Manual / Procedures
• Violation of due process in boundary determination
• Possible professional misconduct / negligence



🔴 2. Failure to Consider Adjoining Claims / Investigation

Under the Manual:

Basis (DAO 98-12 / LMB Manual):
• Engineers must:
• Identify adjoining owners
• Investigate claims
• Coordinate boundaries

👉 “Names and addresses of adjoining owners shall be obtained” 

📌 Violation:

👉 No coordination = invalid or questionable survey result



🔴 3. Overlapping / Encroachment in Survey Result

This is a serious technical violation

Basis (LMB Manual – Relocation Survey):
• Must follow:
• Approved plan / title (metes & bounds)
• Existing monuments and original corners
• Must:
• Record encroachments properly in the report 

📌 Violations:

If overlap occurred:
• ❌ Incorrect relocation / wrong reference point
• ❌ Failure to follow original technical description
• ❌ Failure to report encroachment



🔴 4. Possible Trespass / Illegal Entry (if applicable)

If the GE entered property without notice/consent:

👉 May also violate:
• Civil rights of adjoining owner
• Possible Qualified Trespass under Revised Penal Code 



⚖️ SUMMARY OF VIOLATIONS

A Geodetic Engineer in your case may be liable for:

Under LMB Manual / DENR Rules:
1. Failure to notify adjoining owner (mandatory requirement)
2. Failure to investigate adjoining claims
3. Non-compliance with relocation survey procedures
4. Failure to properly report encroachment

Under Professional Regulation (PRC):
• Negligence / incompetence
• Unprofessional conduct

Under Law:
• Violation of Act No. 2711 (Sec. 1859)
• Possible civil liability (damages due to overlap)
• Possible trespass



💡 Important (Technical Point – very strong argument)

You mentioned:

“Used reference point 1 km away causing deviation”

👉 This strengthens the case:
• Relocation surveys must use nearest and original control/reference points
• Using far reference points can cause misclosure and displacement → overlap

➡️ This is gross technical error / malpractice

13/04/2026

Sample draft of complaint in PRC

REPUBLIC OF THE PHILIPPINES
Professional Regulation Commission
Board of Geodetic Engineering



ADMINISTRATIVE COMPLAINT

COMPLAINANT:
[Your Name]
[Address]

-versus-

RESPONDENT:
[Name of Geodetic Engineer]
Licensed Geodetic Engineer
PRC License No.: [Number]
[Address]



COMPLAINT-AFFIDAVIT

I, [Your Name], of legal age, Filipino, and a resident of [Address], after being duly sworn in accordance with law, hereby depose and state:



1. PARTIES
1. I am the complainant in this case.
2. Respondent is a duly licensed Geodetic Engineer under Republic Act No. 8560, engaged in the practice of land surveying.



2. FACTS OF THE CASE
3. Respondent conducted a land survey on [date] involving a parcel of land located at [location].
4. The purpose of the survey was [relocation/subdivision/consolidation/etc.].
5. Upon review and verification, it was discovered that the survey conducted by the respondent contained serious errors and deviations from standard procedures.
6. Specifically, respondent failed to follow the prescribed rules and procedures under the Land Management Sector (LMS), including but not limited to:
• Failure to tie the survey to established reference points (BLLM/BBM)
• Use of incorrect or unreliable control data
• Erroneous computation and plotting of boundaries
• Non-compliance with the Survey Manual and technical regulations
7. As a result of these errors, the survey produced incorrect boundaries/technical descriptions, causing [conflict/overlap/damage] to the property.



3. VIOLATIONS
8. Respondent’s acts constitute violations of:
a. Republic Act No. 8560
• Failure to exercise due diligence, competence, and accuracy in the practice of geodetic engineering
b. Code of Ethics for Geodetic Engineers
• Negligence and incompetence in the performance of professional duties
c. Land Management Sector (DENR) Survey Rules and Manual
• Non-compliance with prescribed survey standards and procedures
9. The foregoing acts constitute gross negligence, incompetence, and misconduct, warranting administrative sanctions.



4. DAMAGES / EFFECTS
10. Due to the respondent’s erroneous survey, the following damages were incurred:

• [Boundary dispute / encroachment]
• [Financial loss / re-survey expenses]
• [Delay in titling / legal complications]



5. PRAYER

WHEREFORE, premises considered, it is respectfully prayed that the respondent be:
• Found administratively liable; and
• Imposed appropriate penalties such as suspension or revocation of license.

Other reliefs just and equitable are likewise prayed for.



6. VERIFICATION AND CERTIFICATION

I hereby certify that the allegations herein are true and correct based on my personal knowledge and authentic records.



IN WITNESS WHEREOF, I have hereunto set my hand this ___ day of ___, 20.

[Signature]
[Name of Complainant]



SUBSCRIBED AND SWORN

Subscribed and sworn before me this ___ day of ___, 20, affiant exhibiting competent proof of identity.

Notary Public

13/04/2026

If a geodetic engineer conducts a wrong or defective land survey and fails to follow the prescribed standards of the Land Management Sector (LMS), several violations and liabilities may arise under Philippine laws, professional regulations, and administrative rules.

Here’s a clear breakdown:



⚖️ 1. Violation of Professional Standards

Under Republic Act No. 8560, a geodetic engineer is required to:
• Perform surveys with accuracy, integrity, and technical competence
• Follow all approved survey procedures, manuals, and standards
• Ensure correctness of plans, computations, and reports

👉 Failure to follow the LMS Survey Manual may be considered:
• Gross negligence
• Incompetence
• Misconduct in the practice of the profession



📏 2. Violation of LMS (Land Management Sector) Rules

The Land Management Sector (DENR) has strict survey standards (e.g., Survey Manual, LMB Circulars).

Common violations include:
• Incorrect boundary relocation
• Failure to tie survey to approved reference points ,old ps ,pls and markers on the ground refer to MLSP. (BLLM/BBM) if available.
• Use of unverified or outdated control points
• Submission of erroneous survey returns
• Non-compliance with required field procedures and documentation

👉 These can lead to:
• Rejection of survey returns
• Blacklisting or suspension fromf DENR transactions



🏛️ 3. Administrative Liability (PRC)

A complaint can be filed with the
Professional Regulation Commission

Possible penalties:
• Reprimand
• Suspension of license
• Revocation of license to practice

Grounds:
• Negligence
• Fraud or falsification
• Violation of Code of Ethics



⚠️ 4. Civil Liability

If the incorrect survey causes damage (e.g., land dispute, loss of property):
• The geodetic engineer may be liable for damages
• Affected parties can file a civil case for compensation

Examples:
• Wrong boundary → encroachment
• Wrong area → financial loss



🚨 5. Criminal Liability (if applicable)

If there is intent or fraud, possible violations include:
• Falsification of public documents
• Estafa (fraud)
• Violation of other penal laws



📌 6. Liability if Government Employee

If the geodetic engineer is a government employee:
• Additional violation under
Republic Act No. 6713
• May face:
• Administrative sanctions (dismissal, suspension)
• Disqualification from public office

13/04/2026

I got 88 reactions and 13 replies on my recent top post! Thank you all for your continued support. I could not have done it without you. 🙏🤗🎉

13/04/2026

I gained 123 followers, created 30 posts and received 319 reactions in the past 90 days! Thank you all for your continued support. I could not have done it without you. 🙏🤗🎉

Address

Plaridel

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Geodetic Engineers Forum posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share