Kenvile Construction Services

Kenvile Construction Services MISSION:

KENVILE is committed to deliver UNIQUE, ELEGANT but PRACTICAL and FUNCTIONAL house designs

VISION:

A fully established and viable construction firm ready to indulge with any challenge of the modern world of construction industry. QUALITY POLICY:

KENVILE is committed to manage every project responsibly and with full honesty. KENVILE is bound to utilize materials specified in the agreed cost proposal, construct according to agreed plans, deliver projects on track and provide the best quality which every KENVILE's client deserves.

23/12/2025

Behind the graceful walls of this elegant home is the blood and sweat, sacrificed comforts, dreams, and even relationships just to build a legacy that beauty alone can never reveal.

Designer: Ar. Ken L Eurolfan-Bagasol

To learn more about this project, you can contact us at 09222661957/09761165052 or email us at [email protected].

Services We Offer:

👉Free Consultation
👉Complete signed and sealed architectural and engineering plans
👉Permitting Assistance
👉Cost Estimates
👉Design and Construction Management
👉New Building Construction/Renovation/Fit-Out


_____________________________________________

10/10/2025
10/10/2025

Antipolo to Southwoods Real Quick
Errands

12/08/2025
12/08/2025
23/03/2025

San Beda Project


22/03/2025

FOOTING

Footings are essential structural elements that transfer the load of a building to the soil, ensuring the structure remains stable and prevents sinking or to uneven settlement.

Procedures of Footing Construction:

1. Excavation down to the designed depth +50mm for gravel bedding.
2. Compact the excavated soil.
3. Spread out gravel bedding for atleast 50mm thick.
4. Fabricate and Install the Rebars. Make sure to install the 75mm thick spacer blocks .
5. Install the Column Reinforcement and make sure to follow the development length needed as per design.
6. Protect the column reinforcement to avoid concrete mess during pouring.
7. Concrete Pouring with vibration to make sure the concrete will be evenly spread-out to the entire footing especially at the perimeter of the column.
8. Watering the concrete footing atleast 3x a day for 7 days for faster curing to meet its desired strength.

12/03/2025

Lower Bicutan Team!

11/03/2025

SPACER BLOCKS

These blocks are used as spacers to maintain the concrete cover of steel reinforcements. The depth varies depending on the type of structure and construction methodology. The cast-in-place concreting is commonly used in residential buildings wherein we use minimum concrete cover of 75mm for footing, 40mm for columns, beams and slab on grade and 20mm for suspended slab. Prestressed and precast methodology have other conditions as specified in the NSCP.

10/03/2025

"PADUGO" is a traditional Filipino ritual where we drip an animal blood into our first concrete pouring at site to drive away evil spirits for a peaceful construction.

Address

B72 L63 Jp Rizal Street
Taguig
1633

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm
Saturday 8am - 5pm

Telephone

+639761165052

Website

Alerts

Be the first to know and let us send you an email when Kenvile Construction Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Kenvile Construction Services:

Share