Paragon Phils. Construction and Development Corporation

Paragon Phils. Construction and Development Corporation Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Paragon Phils. Construction and Development Corporation, Construction Company, blk 8 lot 1 jeremiah Street exodus brgy. sta. ana, taytay rizal, Taytay.

We offer General Engineering Services, specializes to Port Construction, Pile Driving Works (Offshore and Onshore), Dredging, Marine Equipment Rental, Heavy Equipment Rental, Marine Logistics and Land Development.

Navotas Pile Driving Works.
04/10/2022

Navotas Pile Driving Works.

28/09/2022
30/08/2022

Off-Shore Pile Driving Works
Batangas

Off-Shore Pile Driving Works of Spiral Pipe Pile @ Ilijan, Batangas45 meter length. 1.2 Diameter Single Stick.
30/08/2022

Off-Shore Pile Driving Works of Spiral Pipe Pile @ Ilijan, Batangas
45 meter length.
1.2 Diameter Single Stick.

30/08/2022

Off-Shore Pile Driving Works of Spiral Pipe Pile @ Ilijan, Batangas
45 meter length.
1.2 Diameter Single Stick.

Pile Driving Works - Navotas Fishport
11/06/2022

Pile Driving Works - Navotas Fishport

Pile Driving of 30 pcs. concrete piles, Manila Yacht Club.
12/05/2022

Pile Driving of 30 pcs. concrete piles,
Manila Yacht Club.

Suppy of 2000 dwt Vessel for Loading and Unloading of Core and Armour Rocks at Wawa, Nasugbu Port Breakwater.Start: Sept...
21/10/2021

Suppy of 2000 dwt Vessel for Loading and Unloading of Core and Armour Rocks at Wawa, Nasugbu Port Breakwater.

Start: September 23, 2021

21/10/2021

Actual Dredging Operation

13 cubic meter Grab Dredger

BATAAN DREDGINGPort of Capinpin, Orion BataanTotal Volume: 19,000.00 cubic meterDate Start: September 10, 2021Date Finis...
21/10/2021

BATAAN DREDGING

Port of Capinpin, Orion Bataan
Total Volume: 19,000.00 cubic meter
Date Start: September 10, 2021
Date Finish: September 15, 2021
Total no. of Days Operation: 5 working days for 24 hours operation
Equipment: 1 set of Dredging Fleet Consist
13 cubic meter Grab Dredger
800 cubic meter Split Type Hopper Barge
900 hp Towing Tugboat

Port of Lamao, Limay Bataan
Total Volume: 19,000.00 cubic meter
Date Start: September 16, 2021
Date Finish: September 25, 2021
Total no. of Days Operation: 9 working days for 24 hours operation
Equipment: 1 set of Dredging Fleet Consist
13 cubic meter Grab Dredger
800 cubic meter Split Type Hopper Barge
900 hp Towing Tugboat

Address

Blk 8 Lot 1 Jeremiah Street Exodus Brgy. Sta. Ana, Taytay Rizal
Taytay

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5am
Saturday 9am - 3:45pm

Telephone

+639171183193

Website

Alerts

Be the first to know and let us send you an email when Paragon Phils. Construction and Development Corporation posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share