DORELCO

DORELCO The DORELCO, is an Electric Distribution utility duly organized and existing under the laws of the Republic of the Philippines. Fe and Pastrana to LEYECO III.

Don Orestes Romualdez Electric Cooperative, Inc. (DORELCO) was established in June 21, 1971, thru declaration of PD 269, as Leyte Electric Cooperative, Inc. (LECI) financed by a Long Term Loan of Php28M to the government through National Electrification Administration (NEA) by USAID. At the start, it operated as a power generation company, with ten generators as source of power, supplying electric

ity to the towns of Burauen, Dagami, Dulag, Julita, Lapaz,Mayorga, Sta Fe, Pastrana, Tabontabon and Tolosa. In 1974, the name LECI was changed to LEYECO I, and expanding its franchise coverage area to Municipality of Abuyog, Macarthur, Mahaplag and Tanauan, while giving up Municipality of Sta. In 1976, in honor of the late Don Orestes Romualdez, owner of the land where EC’s headquarters is situated, the name DORELCO was created and used.With the commissioning of two PIELSTICK generator set in 1977, DORELCO supplied power to LEYECO II, LEYECO III and SOLECO. In 1981, another one unit MAN generator with the capacity of 2.2MW was again commissioned. On March 11, 1982 National Power Corporation commissioned the 112.5MW Tongonan Geothermal power, providing power requirements of DORELCO for a lower rates, while eliminating generation cost and eventually giving a power cost reduction to the end consumers, forcing DORELCO’s business to convert from power generation to power distribution. When NPC took over the administration of 69kV line in 1988, DORELCO lost average revenue per month of Php5.7M putting financial constraints for operational cost and liability obligations. These continued further in 1995 when SOLOIL, the large consumer of DORELCO decided to generate its own power thus increasing systems losses. Because of the worsening of its system, DORELCO resolved to secure financial assistance from other funding institutions for the purpose of rectifying deficiencies of its power distribution system by developing its facilities in order to comply the mandated operational standard on distribution services and connections to its customers within its coverage area consistent with the Power Distribution and Grid Code (PDC-PGC) and the EPIRA law. As per plantilla there are 172 positions where 118 of those are filled-up and 54 positions are vacant. Also there are 112 non-permanent personnel making a total of 284 employees. The Cooperative operates two (2) substations in the following locations and capacity:

San Roque, Tolosa 10 MVA

Picas, Javier 5 MVA

DORELCO’S Main Office is located in BarangaySan Roque, Tolosa, Leyte. The two (2) Sub-Offices are located in Burauen and Javier Leyte. The franchise area which is 164,426 hectares bounded by the Pacific Ocean on the eastern part and the mountainous range of the coverage area lies the Municipality of Burauen, Dagami and Lapaz on the western part while the Municipality of Abuyog, Javier and Mahaplag on the southern portion and the municipality of Tanauan on the northern side.

𝗗𝗒π—₯π—˜π—Ÿπ—–π—’ 𝗕π—₯π—œπ—‘π—šπ—¦ 𝗣𝗒π—ͺπ—˜π—₯ π—₯π—”π—§π—˜ π——π—œπ—¦π—–π—¨π—¦π—¦π—œπ—’π—‘ 𝗧𝗒 π—§π—’π—Ÿπ—’π—¦π—” M𝗖𝗒s DORELCO Management continued its Information, Education, and Communi...
20/08/2026

𝗗𝗒π—₯π—˜π—Ÿπ—–π—’ 𝗕π—₯π—œπ—‘π—šπ—¦ 𝗣𝗒π—ͺπ—˜π—₯ π—₯π—”π—§π—˜ π——π—œπ—¦π—–π—¨π—¦π—¦π—œπ—’π—‘ 𝗧𝗒 π—§π—’π—Ÿπ—’π—¦π—” M𝗖𝗒s

DORELCO Management continued its Information, Education, and Communication (IEC) Campaign on electricity rates through a dialogue with the Public Officials of Tolosa on August 19, 2026.

AGM Christopher A. Garcia, together with Engr. Melben T. Abrera, TSDM, discussed with the Municipal Councilors, Barangay Captains, and other local officials the challenges faced by electric cooperatives, particularly the impact of Line Loss and Congestion Cost (LLCC) on electricity rates.

AGM Garcia also sought the support and cooperation of the local officials and community leaders in DORELCO’s efforts to address LLCC and help reduce the power costs passed on to consumers.

DORELCO sincerely thanks the officials of Tolosa for welcoming us and for supporting our efforts to provide accurate and timely information to our Member-Consumer-Owners.

𝗒𝗻𝗲𝗗𝗒π—₯π—˜π—Ÿπ—–π—’ β€” 𝐸𝓃𝑒𝓇𝑔𝒾𝓏𝒾𝓃𝑔 π»π‘œπ“Šπ“ˆπ‘’π’½π‘œπ“π’Ήπ“ˆ, πΈπ“‚π“…π‘œπ“Œπ‘’π“‡π’Ύπ“ƒπ‘” π’«π‘’π‘œπ“…π“π‘’.

DORELCO BRINGS POWER RATE DISCUSSION TO SB JULITADORELCO stregthened  its information drive on the factors affecting ele...
18/08/2026

DORELCO BRINGS POWER RATE DISCUSSION TO SB JULITA

DORELCO stregthened its information drive on the factors affecting electricity rates as it appeared before the Sangguniang Bayan Members of Julita, Leyte during its session earlier today, August 18.

The discussion, led by Assistant General Manager Christopher A. Garcia, focused on the increasing Line Loss and Congestion Charges and their impact on the overall cost of electricity being passed on to consumers.

This is part of DORELCO’s initiative to bring important power-related concerns closer to its Member Consumer-Owners by providing clear and timely information through local government officials and community leaders.

Thank you, Sangguniang Bayan of Julita, for providing DORELCO the opportunity to share this important information with your members and constituents.

⚑ AUGUST 2026 POWER BILL RATE UPDATE ⚑Good news to our valued DORELCO consumers! πŸ’‘For August 2026, DORELCO’s overall pow...
17/08/2026

⚑ AUGUST 2026 POWER BILL RATE UPDATE ⚑
Good news to our valued DORELCO consumers! πŸ’‘

For August 2026, DORELCO’s overall power rates have generally decreased compared with July 2026.

πŸ“‰ Generation Charge: β‚±9.1869 β†’ β‚±7.0682/kWh
Decrease: β‚±2.1187/kWh

πŸ“ˆ Transmission Charge: β‚±1.5053 β†’ β‚±1.9779/kWh
Increase: β‚±0.4726/kWh

➑️ Distribution Charge: β‚±2.0750 β†’ β‚±2.0750/kWh
No Change

πŸ“‰ Other Charges: β‚±2.1841 β†’ β‚±2.1272/kWh
Decrease: β‚±0.0569/kWh

As a result, the August 2026 VAT-exclusive power rates are:

🏠 Residential: β‚±13.2483/kWh
πŸ“Š Commercial: β‚±11.6238/kWh
🏭 Industrial: β‚±9.1954/kWh

Compared with July, the residential rate decreased by β‚±1.7030/kWh, while commercial and industrial rates decreased by β‚±1.8266/kWh and β‚±2.1756/kWh, respectively.

The decrease in the overall power rate is largely reflected in the lower Generation Charge, which more than offset the increase in the Transmission Charge.

πŸ’™πŸ’› DORELCO remains committed to providing transparent and timely information about your electricity rates.

Please note: The rates shown are VAT EXCLUSIVE. Your actual bill may vary depending on your electricity consumption and applicable charges.

Understanding Manual Load Dropping (MLD)⚑ WHY DO WE EXPERIENCE ROTATIONAL BROWNOUTS?Have you ever wondered why power int...
15/08/2026

Understanding Manual Load Dropping (MLD)

⚑ WHY DO WE EXPERIENCE ROTATIONAL BROWNOUTS?

Have you ever wondered why power interruptions sometimes occur even when there is no problem with your local distribution system?

Manual Load Dropping (MLD) is a controlled measure implemented by the National Grid Corporation of the Philippines (NGCP) when the available power supply is not enough to meet the demand or when the stability of the power grid is at risk.

MLD may become necessary when power generation is insufficient, power plants unexpectedly trip or shut down, transmission facilities are at risk of overloading, or the grid is placed under Yellow or Red Alert due to insufficient power reserves.

πŸ”Œ HOW DOES MLD WORK?

NGCP coordinates with electric cooperatives and distribution utilities to temporarily reduce electricity demand in selected areas. This may result in scheduled or rotational power interruptions to help balance the system and prevent a more serious grid-wide blackout.

When power supply becomes sufficient or electricity demand decreases, the MLD schedule may be canceled as grid conditions improve.

πŸ’‘ REMEMBER:
MLD is a protective measureβ€”not a failure of the electric cooperative.

Temporary power interruptions help protect the stability and reliability of the entire power system and prevent potentially widespread and prolonged blackouts.

🀝 LET US ALL DO OUR PART!

During periods of high demand or grid alerts, every kilowatt saved can make a difference. Let us conserve electricity by using only what we need and avoiding unnecessary energy consumption.

SAVE ENERGY. SAVE THE GRID.

Calling All DORELCO Member Consumer Owners!Ready to turn your creativity into something bright, beautiful, and sustainab...
14/08/2026

Calling All DORELCO Member Consumer Owners!

Ready to turn your creativity into something bright, beautiful, and sustainable?

Join the DORELCO ECO-CYCLE SUSTAINABLE PAROL CHALLENGE!

Create your very own Filipino Parol using recycled, repurposed or reusable materials and showcase your creativity while promoting environmental sustainability.

WIN CASH PRIZES!
1st Prize – β‚±5,000
2nd Prize – β‚±3,000
3rd Prize – β‚±2,000

But waitβ€”there's more!

GO BIGGER! GO PHILRECA!
Your winning DORELCO entry will have the chance to compete at the PHILRECA National Level for the BEST ECO-CYCLE PAROL and a chance to win β‚±20,000 CASH PRIZE!

Submission of Entries: September 1–5, 2026

OPEN TO ALL DORELCO MEMBER-CONSUMER-OWNERS!

MECHANICS
1. One (1) entry per Member-Consumer-Owner Only.
2. Each entry must be a recycled Christmas Parol with a minimum diameter or height of four feet.
3. The parol must have prominently incorporate the logo of DORELCO into its design.
4. The parol must be sturdy and suitable for indoor or outdoor display.
5. Participant must submit the following:
OFFICIAL PHOTO OF THE OUTPUT-( 1-5 photos of the final output design)
CREATIVE REEL OF THE OUTPUT( 1-2 minute reel featuring the parol, its design and highlights of its creation) and
LIST OF MATERIALS USED.

𝐍𝐆𝐂𝐏 𝐑𝐄-𝐒𝐂𝐇𝐄𝐃𝐔𝐋𝐄𝐃 ππŽπ–π„π‘ πˆππ“π„π‘π‘π”ππ“πˆπŽπPlease be informed that the National Grid Corporation of the Philippines (NGCP) has ...
14/08/2026

𝐍𝐆𝐂𝐏 𝐑𝐄-𝐒𝐂𝐇𝐄𝐃𝐔𝐋𝐄𝐃 ππŽπ–π„π‘ πˆππ“π„π‘π‘π”ππ“πˆπŽπ

Please be informed that the National Grid Corporation of the Philippines (NGCP) has re-scheduled its power interruption on:

Date of Interruption: August 21, 2026
Affected Area: Entire DORELCO Franchise Area

Time of Interruption:
β€’ 5:01 AM – 6:00 AM β€” 1 hour during isolation
β€’ 5:01 PM – 6:00 PM β€” 1 hour during normalization

Reason: NGCP scheduled maintenance activity along the Ormoc–San Isidro 69kV transmission line, particularly the Abuyog–San Isidro portion.

For further details and updates, please call our MCO 24/7 Hotline Numbers:

πŸ“ž 0919 069 5838 – Smart
πŸ“ž 0956 619 1910 – Globe


Dorelco Mayorga Substation
Dorelco Javier Substation
Dorelco Abuyog Substation

HAPPENING NOW AT DORELCO!DORELCO Mid-Year Assesment and Planning 2026 is currently underway today, August 12, 2026, at t...
12/08/2026

HAPPENING NOW AT DORELCO!

DORELCO Mid-Year Assesment and Planning 2026 is currently underway today, August 12, 2026, at the DORELCO Solidarity Hall.

This important activity brings together DORELCO’s team to assess our performance and accomplishments for the first half of the year, identify challenges and areas for improvement and set clear plans and strategies for the remaining months of 2026.

This is also an opportunity to reflect, realign and recommit to our shared goals as we continue to provide reliable and responsive service to our MCOs.

Together, we move forward with one goalβ€”to continuously improve, strive for excellence and serve better.

KEEP OUR COMMUNITY SAFE & ENERGIZED! ⚑Power lines are essential to our daily lives, but obstructions near energized line...
10/08/2026

KEEP OUR COMMUNITY SAFE & ENERGIZED! ⚑

Power lines are essential to our daily lives, but obstructions near energized lines can cause power interruptions, fires, serious injuries, and even loss of life.

Let’s work together to keep our communities safe. Please help prevent power line obstructions by keeping trees and branches, buildings and structures, billboards and signs, construction equipment, kites and other objects, as well as unauthorized wires and attachments, away from power lines.

πŸ‘‰ Keep the area around power lines CLEAR at all times.

If you see an obstruction or any unsafe condition near our power lines, report it to DORELCO immediately. Your cooperation helps us maintain safe, reliable, and uninterrupted electric service for everyone.

A safe community starts with us. πŸ’™πŸ’›
DORELCO β€” Energizing Households, Empowering People.
OneDORELCO Family | SAFE β€’ RELIABLE β€’ COMMITTED

For further details,
Call our MCO 24/7 Hotline Numbers:
09190695838 (Smart) and
09566191910 (Globe).

Thank you.

π—ͺπ—›π—œπ—Ÿπ—˜ 𝗬𝗒𝗨 π—–π—’π— π—£π—Ÿπ—”π—œπ—‘, π—§π—›π—˜π—¬ π—ͺ𝗒π—₯π—ž. πŸ’ͺπŸ’™πŸ’›We understand that a power interruption can bring discomfort, inconvenience, and frust...
10/08/2026

π—ͺπ—›π—œπ—Ÿπ—˜ 𝗬𝗒𝗨 π—–π—’π— π—£π—Ÿπ—”π—œπ—‘, π—§π—›π—˜π—¬ π—ͺ𝗒π—₯π—ž. πŸ’ͺπŸ’™πŸ’›

We understand that a power interruption can bring discomfort, inconvenience, and frustrationβ€”especially under the scorching heat of the sun. But while we wait for the lights to come back on, our linemen are already out in the field, working tirelessly to restore your electricity.

High above the ground, exposed to the heat, wind, and other hazards, they climb poles and work on power lines to bring back the service we depend on every day. Their job is not only difficultβ€”it is dangerous, and every restoration comes with the responsibility of putting safety first.

πŸ’™ We feel your frustration.
πŸ’› Please be patient and understanding.
πŸ›‘οΈ Safety is our priority.

Every minute spent repairing a line is a minute spent bringing power closer to your home, business, and community. Let us give our linemen the time they need to perform their work safely and properly.

Because behind every restored power is a team of dedicated people putting their safety on the line for you.

Thank you, Linemen! We appreciate you! πŸ’™πŸ’›
Your comfort matters. Your concerns matter.

But safety matters more.

=======================================
For power interruption,
Call our MCO 24/7 Hotline Numbers:
09190695838 (Smart) and
09566191910 (Globe).

Address

National Highway, Barangay San Roque
Tolosa
6503

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm