FQ SOLAR

FQ SOLAR Engineering services

32kw hybrid set up  with 60kwhr batttery coming up...
22/05/2026

32kw hybrid set up with 60kwhr batttery coming up...

18kw hybrid on/off grid system paired with 64kwhr back up battery for day and night energy savings. Thank you for trusti...
18/05/2026

18kw hybrid on/off grid system paired with 64kwhr back up battery for day and night energy savings. Thank you for trusting us doc

Up to 12 months 0% interrest. Send us a message for details
13/05/2026

Up to 12 months 0% interrest. Send us a message for details

Another solid installation done  at Poblacion, Baroy, Lanao del Norte 💪☀️🔹 7.2kWp Solar PV System🔹 6kW Hybrid Inverter🔹 ...
01/05/2026

Another solid installation done at Poblacion, Baroy, Lanao del Norte 💪☀️
🔹 7.2kWp Solar PV System
🔹 6kW Hybrid Inverter
🔹 20kWh LiFePO4 Battery
From high electric bills to energy independence ⚡
Daytime savings + nighttime backup = total control.
Powered by FQ Solar Power Engineering Services.

⚡ ANOTHER CEBU PROJECT COMPLETED📍 Laray, Inayawan Cebu☀️ 8.5kWp Solar Panels🔋 8kW Hybrid Inverter🔋 20kWh LiFePO₄ Battery...
26/04/2026

⚡ ANOTHER CEBU PROJECT COMPLETED
📍 Laray, Inayawan Cebu
☀️ 8.5kWp Solar Panels
🔋 8kW Hybrid Inverter
🔋 20kWh LiFePO₄ Battery
✔️ Lower electricity bills
✔️ Reliable backup power
✔️ Ready for heavy household loads
⚙️ Made by FQ SOLAR POWER ENGINEERING SERVICES
📩 Message us for installation
📲 0905-947-1401
📲 0915-604-1828

Completed ✅3.6kW Hybrid Solar + 6.144kWh Battery + 6kW Inverter ⚡Thank you Perocho Family for trusting FQ Solar ☀️Enjoy ...
17/04/2026

Completed ✅
3.6kW Hybrid Solar + 6.144kWh Battery + 6kW Inverter ⚡
Thank you Perocho Family for trusting FQ Solar ☀️
Enjoy lower bills and reliable power!

17/04/2026

LUZON GRID ALERT STATUS
as of 16 April 2026, 5PM

𝐘𝐞𝐥𝐥𝐨𝐰 𝐀𝐥𝐞𝐫𝐭
4:00PM-10:00PM

Capacity - 12,223MW
Demand - 11,966MW

35 plants are on forced outage; while 14 are running on derated capacities, for a total of 5137.2MW unavailable to the grid.

Factors that contributed to the raising of yellow alert:
- tripping of EERI 1, 2, 3; Ilijan Block A; and Ilijan Block B
- unavailability of hydro plants (Magat 1, 2, 3, 4)

A yellow alert is issued when the operating margin is insufficient to meet the transmission grid’s contingency requirement.


We’re thankful to be fully booked this month 🙏To all confirmed clients, your installations will proceed this month of Ma...
13/04/2026

We’re thankful to be fully booked this month 🙏
To all confirmed clients, your installations will proceed this month of May as scheduled. We appreciate your trust.
📍 Our team will be in Cebu on the 3rd week of this month for solar installations.
Feel free to message us in advance if you’d like to coordinate.

Completed another 6kW Hybrid Solar System 🔥Paired with a 10kWh LiFePO4 Battery for maximum efficiency and backup power.D...
07/04/2026

Completed another 6kW Hybrid Solar System 🔥
Paired with a 10kWh LiFePO4 Battery for maximum efficiency and backup power.
Don’t wait for rising electricity rates — go solar now.

THE BEST TIME TO GO SOLAR IS NOWWith easy credit card installment options 💳Start saving today, pay over time.
30/03/2026

THE BEST TIME TO GO SOLAR IS NOW
With easy credit card installment options 💳
Start saving today, pay over time.

Completion of an 18 kW AC-coupled solar system with a 15 kWh backup battery at Lala, Lanao del Norte— ready to upgrade n...
11/12/2025

Completion of an 18 kW AC-coupled solar system with a 15 kWh backup battery at Lala, Lanao del Norte— ready to upgrade next year.
Another step toward smarter, more reliable clean energy. Thank you for trusting FQ Solar Power Engineering Services.

Address

Purok 6
Tubod
9209

Opening Hours

Monday 8am - 7pm
Tuesday 8am - 7pm
Wednesday 8am - 7pm
Thursday 8am - 7pm
Friday 8am - 7pm
Saturday 8am - 7pm
Sunday 1pm - 7pm

Telephone

+639059471401

Website

Alerts

Be the first to know and let us send you an email when FQ SOLAR posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share