MY Design and Construction

MY Design and Construction “QUALITY is our TOP PRIORITY”

Services Offered:
Design (Structural, Architectural and Interior)
Estimates
Auto Cadd (Building Plans)
Renovation Works
General Construction Services

22/07/2026

One-Way Slab vs Two-Way Slab

One-Way Slab: Supported on two opposite sides. Loads are carried in one direction, and the main reinforcement is provided in one direction. Usually used when the longer span is more than twice the shorter span.

Two-Way Slab: Supported on all four sides. Loads are distributed in both directions, so reinforcement is provided in both directions. Commonly used for square or nearly square panels.
Hashtags:

Related Hashtag :

22/07/2026

Maximum and Minimum Values of Riser and Tread

Stair design isn't arbitrary—it's governed by strict standards to ensure safety, comfort, and accessibility.

Minimum Standards:
• Tread: 27cm (horizontal depth)
• Riser: 17cm (vertical height )

22/07/2026

Clean Energy Explained: The Hydropower Process 🌍✨

22/07/2026

Inside the anatomy of a Soil Nailed Retaining Wall! 🏗️🔍 Breaking down reinforcement mesh, shotcrete facing, and subsurface drainage systems. 📐🛠️

22/07/2026

Retaining Wall Types & Uses

Retaining walls are structures built to hold back soil and prevent erosion or landslides. Common types include gravity walls, cantilever walls, counterfort walls, sheet pile walls, and reinforced earth walls. They are widely used in highways, basements, bridge approaches, and hillside construction.

Related Hashtag :

22/07/2026

👷‍♂️ Stairway Safety Alert: Always Plan for Landings! 📐

22/07/2026

Soil Nailing vs Retaining Wall

Soil Nailing: Reinforces existing soil using steel bars (nails) to stabilize slopes and deep excavations. It is cost-effective and ideal for limited spaces.

Retaining Wall: A rigid structure built to hold back soil and prevent erosion or collapse. It is commonly used where permanent earth support is required.

Related Hashtag :

Thank you to our regular customer. Thank you for the trust.
24/06/2026

Thank you to our regular customer. Thank you for the trust.

24/06/2026

Behind every smooth mountain highway is an invisible feat of geotechnical engineering. 🛣️📐

​When cutting through unstable mountainous terrain, standard retaining walls aren't enough. That is where top-down construction and Soil Nailing come into play to secure an 18-meter vertical drop.

​The anatomy of slope stabilization:
​🛠️ Active Anchoring: Steel soil nails ranging from 8.0m to 12.0m are drilled at a 15-degree angle to anchor the active zone into solid ground.

​💦 Water Management: Geotextile drainage strips prevent water buildup behind the shotcrete face, which is the #1 cause of wall failures.

​🏗️ Load Distribution: High-strength nail plates and nut assemblies lock the facing panel to the grout columns.

​⛰️ Foundation Security: A mas
sive 1.80m concrete footing ensures stable weight distribution at the toe of the slope.

​From the asphalt pavement down to the stable soil stratum, precision ex*****on keeps our infrastructure safe. 🇺🇸👷‍♂️

Address

Tuguegarao City
3500

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 8am - 5pm
Saturday 9am - 5pm

Website

Alerts

Be the first to know and let us send you an email when MY Design and Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to MY Design and Construction:

Shortcuts

Share