بسم الله الرحمن الرحيمIn the name of Allah, the Beneficent, the Merciful. Some snaps captured of brick masonry work on f...
16/09/2022

بسم الله الرحمن الرحيم
In the name of Allah, the Beneficent, the Merciful. Some snaps captured of brick masonry work on first floor of spanish villa under construction.







13/09/2022

"In the name of God, the Most Gracious, the Most Merciful"
Some of the snaps captured at site of Spanish Villa under construction on Canal Road Faisalabad.








The latest residential project by Taha Engineering Associates is ongoing. The construction of this new Spanish Villa is ...
26/04/2022

The latest residential project by Taha Engineering Associates is ongoing. The construction of this new Spanish Villa is another addition to the responsibilities that Taha Engineering Associates have taken on. Currently work on foundation is being done. The masonry and bricklaying processes are in full swing. True to our name, speedy and reliable work ethic of our company will ensure expedited completion of this project.







Excavation day at our new construction site for residential project on canal road Faisalabad.This shall be the model vil...
03/04/2022

Excavation day at our new construction site for residential project on canal road Faisalabad.This shall be the model villa in 2- canal category(Spanish style).






.

13/03/2022

Few video clips captured during Terrazo flooring laying at our site in Khurrianwala Faisalabad.






Some of the snaps which were captured while laying Terazzo Flooring on subfloor level.9 nos chips mixed properly with pr...
13/03/2022

Some of the snaps which were captured while laying Terazzo Flooring on subfloor level.
9 nos chips mixed properly with proper ratio mixture of marble powder, white cement and portland cement is used while laying this flooring.
4 inch of 1:4:8 concrete is poured first after which 3 inch of 1:2:4 was poured with marble lining fitting in transition .
There are snaps attached after 3 rounds of grinding which is still in process.







Few of the pictures taken during the Tile work going on in washroom and kitchen area at our site today in Khurrianwala F...
08/03/2022

Few of the pictures taken during the Tile work going on in washroom and kitchen area at our site today in Khurrianwala Faisalabad.We are using 12*28 inch tiles with a light grey smooth textured matte tiles on walls and dark greyish matte tiles on floor area.
Tiles are being fixed with after applying a thick layer of tile bond which enhances its grip with the wall and floor.








A few snaps from false ceiling work going on at our site in Khurrianwala- Faisalabad.Using gypsum board with 2ft by 2ft ...
05/03/2022

A few snaps from false ceiling work going on at our site in Khurrianwala- Faisalabad.Using gypsum board with 2ft by 2ft sheets and 12mm thickness further adds a lot to a decent look and fineness in the ceiling.






.

Laying Tiles on roof for top layer.Water Treatment.          .
11/02/2022

Laying Tiles on roof for top layer.
Water Treatment.





.

Plinth Protection Wall under construction at site in Khurrianwala,Faisalabad.
11/02/2022

Plinth Protection Wall under construction at site in Khurrianwala,Faisalabad.





Some of the snaps captured during ongoing roof treatment on construction site in Khurrianwala,Faisalabad.One thin layer ...
09/12/2021

Some of the snaps captured during ongoing roof treatment on construction site in Khurrianwala,Faisalabad.One thin layer of bitumen emulsion applied after proper cleaning of roof top.It helps in blocking the pores in concrete which prevents from seepage.
Then a thick layer is applied after that thin layer applied before is dried up.After this is done premium quality (Pure) polythene sheet is spread over this bitumen layer.
Above this we set jumbolon sheets with proper orientation that no space is left.When these sheets are set another layer of polythene is spread over this.
Over this second layer of polythene soil is spread and proper beds are prepared keeping in view that proper slope is made as per client's requirement.Tiles are then grouted on the top layer being the last layer.







09/12/2021

One of the visual from roof treatment going on at construction site in Khurrianwala Faisalabad.Laying of jumbolon board after applying bitumen emulsion and polythene sheet above roof slab.






Address

Faisalabad

Telephone

+923137177981

Website

Alerts

Be the first to know and let us send you an email when Taha Engineering Associates. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Taha Engineering Associates.:

Share