Pak Advance construction

Pak Advance construction السلام عليكم ورحمة الله وبركاته

The final joint survey of the murree  project
26/11/2025

The final joint survey of the murree project

Alhamdulillah, after a year of hard work, our project is finally coming to fruition. (KTMD) stage 1
24/10/2025

Alhamdulillah, after a year of hard work, our project is finally coming to fruition.
(KTMD) stage 1

Update progress at site after 4 months
04/09/2025

Update progress at site after 4 months

08/06/2025

جو لوگ ہمت نہیں رکھتے انہیں قسمت موقع بھی نہیں دیتی یاد رکھنا،
کیوں کہ ،
انسان کی فطرت ہے کہ وہ اپنی منزل پر جلد پہنچنا چاہتا ہے،
تو منزل پر پہنچنے کے لئے اس کی نظر ان خطرات پر نہیں ہوتی جو راستے میں پیش آتے ہیں،
اسی لیے کامیابی وہ پاتے ہیں جو ان خطرات سے آگاہ ہوتے ہیں بخوبی

After a long time, today is the last duty with Yasir Khan at the end of the project. Gandhara Daynamic
15/05/2025

After a long time, today is the last duty with Yasir Khan at the end of the project. Gandhara Daynamic

In a cheerful mood with my colleagues & staff
21/02/2025

In a cheerful mood with my colleagues & staff

One should try till the last breath. Whether you find a destination or experience, both are rare.
07/02/2025

One should try till the last breath.
Whether you find a destination or experience, both are rare.

Good progress at Gandara Dynamic
27/01/2025

Good progress at Gandara Dynamic

Aj's updated canal dressing In the supervising of M younas
05/12/2024

Aj's updated canal dressing In the supervising of M younas

Good progress  of pak Advance at Canal lining,  performed by Abdullah shah & M Younas
27/11/2024

Good progress of pak Advance at Canal lining, performed by Abdullah shah & M Younas

Good progress at site (KTMD)
06/10/2024

Good progress at site (KTMD)