Injection molding

Directions Contact the business

Injection molding This Page belong for all group members of injection molding group kindly join it

I am china plas group admin Dilshad Hussain
15/04/2025

I am china plas group admin Dilshad Hussain

"Exciting News!We're thrilled to announce the successful testing of our Unique Gating System for High-Speed Injection Mo...
04/04/2025

"Exciting News!

We're thrilled to announce the successful testing of our Unique Gating System for High-Speed Injection Moulding Process!

This innovative system has yielded impressive results, with a 100% success rate and significant savings in:

1. Smooth cutting, reducing waste and improving product quality
2. Manpower effort, freeing up resources for more strategic tasks
3. Labor costs, boosting operational efficiency
4. Enhanced safety on the shop floor, protecting our team members
5. Optimized use of injection machine cores, maximizing equipment utilization
6. Reduced operator workload, minimizing the likelihood of cycle changes
7. Convenient changeable knife in mould, streamlining maintenance
8. Flexible operation, allowing for seamless switching between modes

This breakthrough is a testament to our team's dedication to innovation and excellence. We're eager to explore the vast potential of this technology and take our operations to the next level!

Share your thoughts and congratulations!

"

Mould Flow study is one of the final key point to do it for hot runner moulds specially for thin wall items, atleast onc...
11/07/2024

Mould Flow study is one of the final key point to do it for hot runner moulds specially for thin wall items, atleast once in a month.
Geneal points How to do it?
1. Adjust manifolds and manifolds back plates at appropriate temperature with respect your material recipe (in My below study it is 245°C PS recipe).
2. Adjust All mould nozzle Temperature >5°C from manifold temperatures (in my case it was 250°C for PS recipe).
3. Adjust injection pressure and speed where you feels material starts filling (in my case it was1500KN and speed 180-350mm/s for PS recipe)
4. Adjust the holding pressure at zero bars.
5. Try to fill 70-80% of parts sizes and then adjust only mould Nozzle heater temperatures up for less filling cavities and down for more filling cavities until you get all cavities filled equally at 70-80%.
6. Note down the maximum and minimum temperatures of mould nozzles and take the Difference between maximum and minimum which is your temperature Delta for that mould(in my case it was coming 20°C for PS recipe)
7. if temperature Delta is more than 40°C then your mould should go to maintenance otherwise your process is not good for rheological and mechanical properties of your thin wall product which yiu are producing.

key points achieved by this test.
1.Some times you get customer complain about few cavities that they are breaking while others are not during end users, so at that case need to do flow study immediately to troubleshoot it from his root
2. if you feel same reputedly cavity parts are cracking during ejection from tool while others are ok then do a flow study, it can be from more share stress because temperature delta is too high.
3. in worst case might repeatedly blackspots will aper in same cavities during commercial production while others are good then its because of more temperature Delta and root cause can be found by flow study.

Achievement
main goal i achieved is found my 48-cavities spoon mould is at perfect state and I can runn it for commercial production.
thanks for reading and try by yourself incase of your tools and let me know the result.
Regards,
Dilshad Hussain
Group Admin

18/04/2024

Quick sale 2-storey warehouse in dadap kosambi tangerang Price below market
- land area 3840 M (2 floors)
- Certificate of Rights & HGB
- 48,000 watt of electricity
- there are mes employees
- there is an office room
- Public Safe and Strategic Location
- Located in a warehouse complex
- complex adjacent to the highway
french
- 15 minutes From soeakerno hatta airport
- 1 km from peak 2
- Close to toll Oute ring road and tolls
Lotus festival
- Near from kosambi highway
salembaran
- 40 ft Container Access
- The road in the complex has been cast concrete
Price Drop 22.5 M
Make contact
081386402941
Hendri

PVC Fitting Factory Full Setup for Sale Active condition a. two emi-Automatic injection Machinesb. ten fitting moulds c....
01/03/2024

PVC Fitting Factory Full Setup for Sale Active condition
a. two emi-Automatic injection Machines
b. ten fitting moulds
c. One grinder Cutter
d. UPS Battery Full Factory
also availabe at Rent 22000PKR/month.
location Gujranwala, Pakistan
If intreated to buy all equipment 1,200,000PKR

Toyo 250Tons Model-1994 , Toyo 80Tons Model-1992 new arrival form JAPAN availabe for pakistani Market.Condition: Used - ...
01/03/2024

Toyo 250Tons Model-1994 , Toyo 80Tons Model-1992 new arrival form JAPAN availabe for pakistani Market.

Condition: Used - Good
Toyo 250 tons 1994 model Price:5200000
Toyo 80 tons 1992 model, , 2400000, total 7600000,
imported from japan

29/02/2024

Full production line video #

Flow study and running thin wall spoon at very old synergy machine with pin point gate mould,
29/02/2024

Flow study and running thin wall spoon at very old synergy machine with pin point gate mould,

Address

Karachi

Opening Hours

Monday 16:00 - 22:00
Tuesday 16:00 - 22:00
Wednesday 16:00 - 22:00
Thursday 16:00 - 22:00
Friday 16:00 - 22:00
Saturday 16:00 - 22:00
Sunday 16:00 - 22:00

Website

Alerts

Be the first to know and let us send you an email when Injection molding posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Injection molding:

Share