BUILD ART

BUILD ART REAL ESTATE - ARCHITECTURE - CONSTRUCTION

01/05/2026

Want stress-free construction?
Turnkey sounds perfect… but is it always?
One contract. One cost. One contractor.
But everything depends on trust and detail.
Contact 03208402222

28/04/2026

construction costs — but only if managed properly.
In this model, the client controls materials, quality, and procurement. This gives flexibility and potential savings, but also brings responsibility. Delays in material, poor supervision, or wastage can quietly increase your overall cost.
Understanding the ground realities before choosing a contract type is critical.
Follow Build Art for practical construction guidance in Lahore & DHA.

29/03/2026

Building a house?
Your biggest decision isn’t design — it’s the type of contract you choose.
Labour rate, turnkey with material, or percentage-based — each one has a different impact on your cost, control, and risk.
Choose wrong… and you might overpay or lose control of your project.
In this video, we break down all three so you can make the right decision before starting construction.
Follow Build Art for practical, no-nonsense construction guidance.

25/03/2026

Everyone is blaming Iran–USA tension for rising costs…
But the reality is — it hasn’t had a major impact on construction rates yet.
Most price changes you see are due to local market factors — not international politics.
Are we overreacting to global news?
What do you think — will it affect rates in the coming weeks?

03/03/2026

Seepage around walls often starts from one hidden mistake — poorly installed water pipes inside the wall.
Improper joint sealing, low-quality fittings, or pressure leakage can slowly damage plaster, paint, and even the wall structure. The problem is usually inside the wall — not on the surface.
In this video, we explained why proper pipe installation, pressure testing, and waterproof detailing are critical during construction.
Fix the source — not just the stain.
Follow Build Art for practical construction and renovation guidance in Lahore & DHA.

20/02/2026
19/02/2026

Damp Proof Course (DPC) is one of the most critical elements in house construction — yet it is often ignored or poorly executed.
Improper DPC installation can lead to rising damp, wall seepage, paint damage, and long-term structural issues. Fixing seepage later is far more expensive than doing DPC correctly at the foundation stage.
In this video, we explained why proper DPC level, material quality, and application method matter.
Build smart. Plan properly. Prevent future repair costs.
For more details
Contact
03208402222

18/02/2026
17/02/2026

Seepage problems in houses are more common in Lahore than most people think and most of the time the root cause is poor planning, not just “old construction.”
In this video we explained the main causes of seepage:
✔️ DPC not on proper levels
✔️ Improper water pipe installation
✔️ Roof water leakage & drainage issues
If these are not handled correctly during construction, repair later becomes expensive and repetitive. Always fix the source — not just the surface.
If you’re planning construction or renovation, proper waterproofing and pipe detailing should never be ignored.
Follow Build Art for practical construction guidance and cost-saving tips for Lahori homes.

Building Tomorrow, Today! 🌐🏗️ Embark on a construction adventure with Build Art. From modern marvels to timeless classic...
12/12/2023

Building Tomorrow, Today! 🌐🏗️ Embark on a construction adventure with Build Art. From modern marvels to timeless classics, we construct stories that last a lifetime.
Visit our Office:
73/5-K CCA, Phase 1, DHA, Lahore, Pakistan
Or
Contact us:
0320 8402222 (WhatsApp & Call)

Alhamdulillah!! New Project Started.Elevate your living with precision-built homes that stand the test of time. 🔨🏡Visit ...
11/12/2023

Alhamdulillah!! New Project Started.
Elevate your living with precision-built homes that stand the test of time. 🔨🏡
Visit our Office:
73/5-K CCA, Phase 1, DHA, Lahore, Pakistan
Or
Contact us:
0320 8402222 (WhatsApp & Call)

Crafting Excellence, Building Legacies! 🏗️🌟 Uncover the magic of construction with Build Art. Elevate your living spaces...
08/12/2023

Crafting Excellence, Building Legacies! 🏗️🌟 Uncover the magic of construction with Build Art. Elevate your living spaces with our commitment to quality and creativity. 🔧🏰
Visit our Office :
73/5-K CCA, Phase 1, DHA, Lahore, Pakistan
Or
Contact us:
0320 8402222 (WhatsApp & Call)

Address

73/5-K CCA, Phase 1, DHA
Lahore
54000

Opening Hours

Monday 10:00 - 18:00
Tuesday 10:00 - 18:00
Wednesday 10:00 - 18:00
Thursday 10:00 - 18:00
Friday 10:00 - 18:00
Saturday 10:00 - 18:00

Telephone

+923208402222

Website

Alerts

Be the first to know and let us send you an email when BUILD ART posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to BUILD ART:

Share