22/10/2026
13 weeks. That's our target from a signed MOU to a financed mesh-grid. ⚡
Getting a DARES project over the line means securing sites, surveying communities, applying for the grant, finalising the design and lining up finance, often while grant windows are closing. So we work through every stage alongside our developer partners:
🟢 Partner: an MOU aligns both teams on costs, roles and financing options. Under a Joint Development Agreement, we also sign the exclusivities and run the surveys.
🟢 Select and size: Pipeline Builder shortlists DARES-eligible sites, and we help design a bankable portfolio around the equity and debt available.
🟢 Secure and survey: exclusivities are registered with NERC, and community surveys happen in the same visit.
🟢 Apply: site-specific applications go to REA through Odyssey, with the documents generated in Pipeline Builder.
🟢 Design and contract: our Network Planner re-checks every site, the developer signs off on the final design and financial model, and procurement begins.
🟢 Train and implement: the implementation plan is timed to the DARES grant window, and installation training gets local teams ready to build.
🟢 Financial close: equity and debt are drawn down, and it's time to build.
Swipe through for the full process. Got communities ready to energise? Contact [email protected] 👇