🏗️ Hidden Beam Construction

A hidden beam is a reinforced concrete beam cast within the slab thickness. It provides structural support while maintaining a flat and smooth ceiling without visible downstand beams.

Construction Steps:
✅ Set out and install formwork
✅ Fix beam and slab reinforcement as per structural drawings
✅ Install electrical and plumbing conduits
✅ Pour and vibrate the concrete together
✅ Cure the concrete properly

Benefits:
✔ Flat and clean ceiling finish
✔ Better architectural appearance
✔ Easier MEP installation
✔ Efficient load distribution
✔ Suitable for modern residential and commercial buildings

Strong structure with a seamless ceiling design.

18/07/2026

🏗️ Hourdi Slab Construction

Hourdi slab is a lightweight reinforced concrete slab system that uses hollow blocks to reduce the dead load of a building while maintaining excellent structural strength.

Construction Steps:
✅ Formwork installation
✅ Placement of Hourdi blocks
✅ Reinforcement fixing
✅ Concrete pouring and vibration
✅ Proper curing

Benefits:
✔ Reduces the building’s weight
✔ Saves concrete and steel
✔ Improves thermal and sound insulation
✔ Suitable for longer spans
✔ Durable and economical

A smart construction method that combines strength, efficiency, and cost savings.

16/07/2026

Scaffolding work for slab

15/07/2026

Hourdi slab
Rib slab ahmed

Hourdi slabRIB slab
15/07/2026

Hourdi slab
RIB slab

Hourdi slab

WPC Linear Ceiling – Uses, Benefits & Installation ProcessUses:* Villa entrances and porches* Outdoor seating areas* Bal...
15/07/2026

WPC Linear Ceiling – Uses, Benefits & Installation Process

Uses:

* Villa entrances and porches
* Outdoor seating areas
* Balconies and terraces
* Commercial and residential ceilings
* Pergolas and covered walkways

Benefits:
✔ Premium wood-like appearance
✔ Water and moisture resistant
✔ Termite and insect resistant
✔ Durable and low maintenance
✔ Weather and UV resistant
✔ Easy to clean and long-lasting

Step-by-Step Installation:

1. Measure the ceiling area and mark the layout.
2. Install the galvanized steel or aluminum support framework.
3. Complete electrical wiring and light fixture preparation.
4. Fix the WPC ceiling panels securely to the framework.
5. Install lights and finishing trims.
6. Inspect alignment, clean the surface, and complete the final finish.

A well-installed WPC linear ceiling combines durability, functionality, and modern aesthetics, making it an excellent choice for both indoor and outdoor spaces.

15/07/2026

WPC ceiling

Marble work
15/07/2026

Marble work

14/07/2026

Before and after bathroom design

14/07/2026

Hourdi Slab Construction – Step by Step

1. Formwork and scaffolding.
2. Bottom reinforcement.
3. Place Hourdi blocks.
4. Install top reinforcement.
5. Complete MEP services.
6. Inspection and approval.
7. Concrete pouring and vibration.
8. Concrete curing.

Why Use a Hourdi Slab?

* Reduces dead load.
* Saves concrete and steel.
* Allows longer spans.
* Improves thermal and sound insulation.
* Provides an economical and durable slab system.