GCI-Grain Capital Industries

GCI-Grain Capital Industries GCI-GRAIN CAPITAL INDUSTRIES SRL – the official representation of the Ukrainian holding GRAIN CAPITAL in Romania.

Self-cleaning boot: why has it become important? 🌾This is directly related to the development of the grain processing in...
26/05/2026

Self-cleaning boot: why has it become important? 🌾

This is directly related to the development of the grain processing industry in Ukraine. The effect is especially noticeable at feed mills, food-processing and seed production facilities, where line capacity is relatively low (10–50 tph), crops are frequently changed, and product cleanliness requirements are high.

One of the main problems of conventional bucket elevators remains the so-called “dead zone” in the boot section. Residual grain, dust, and impurities accumulate in the lower part. All of this requires periodic cleaning, which in turn leads to downtime of the conveying process line.

The ZEO-BE self-cleaning bucket elevator solves this problem through its design. The boot geometry is engineered so that the buckets remove almost all product from the lower section of the elevator during operation. ⚙️

A bucket elevator of this design with a capacity of 20 tph has been successfully installed and is operating at YEDNIST’ GROUP (“Inter-Yednist Holding”).

As a result, the facility receives:
✔️ minimal product residues;
✔️ faster switching between crops;
✔️ lower risk of dust accumulation;
✔️ more stable drive load.

At the same time, a standard boot remains a rational solution for grain elevators, grain storage facilities, and grain terminals due to its ability to handle capacities of up to 1500 tph.

Need a consultation or equipment selection assistance? 📞
+40 745 58 40 40
+38 (067) 489 90 17 (WhatsApp, Telegram)
[email protected]

The future of Ukrainian agribusiness is not about the amount of equipment, but about the efficiency of every ton, every ...
15/05/2026

The future of Ukrainian agribusiness is not about the amount of equipment, but about the efficiency of every ton, every kilowatt, and every technological operation. 🌾

In an open and productive discussion format, Vitaliy Galich delivered a presentation at the Own Elevator conference.

The topic is especially relevant today: the shortage of experienced specialists increasingly leads to mistakes in the design and construction of grain elevators — from poorly planned conveying routes to excessive installed power and high OpEx.

During the presentation, we introduced an approach to classifying grain elevators by energy efficiency level and demonstrated why efficient technological solutions will shape the next generation of Ukrainian grain handling facilities. 📊

Today, a modern grain elevator is no longer just about capacity. It is about economics, automation, logistics, and efficient resource management for years ahead. 🚜

Pelleting Plant: More Complex Than ExpectedDuring the modernization of the aspiration system at a processing plant’s pel...
11/05/2026

Pelleting Plant: More Complex Than Expected
During the modernization of the aspiration system at a processing plant’s pelleting line, Grain Capital specialists installed local and venting filters (ZEO-FUV/FUG, ZEO-FB ⚙️).

On paper, the design was flawless. However, during commissioning, we discovered that dust was accumulating in areas where it shouldn't have been. It became clear that the specific nature of the product required a different approach. Instead of a standard solution, we decided to refine individual filters.

We chose the path of engineering optimization rather than simply replacing the equipment. This allowed the Client to avoid unnecessary costs while achieving a fully functional result.

✅ The Result: Dust is efficiently diverted to the hopper, and dust levels in the production area now meet all state regulatory standards.

Experience proves: a high-quality aspiration system is one that actually performs under your specific operating conditions. While there are many manufacturers on the market, we recommend always turning to professionals with years of experience who support the project through to full commissioning and guaranteed results.

Contact us — we will find the right solution for your specific needs.
📞 Phone: +38 (067) 558 58 19
📧 Email: [email protected]

How much time do you spend trying to figure out what is actually happening in your silos right now?⏳The Osnova Silo Boar...
28/04/2026

How much time do you spend trying to figure out what is actually happening in your silos right now?⏳

The Osnova Silo Board provides an immediate, clear answer by showing exactly what is stored in every single unit of your grain elevator at this very moment.

In a single interface, you can see:
✔️Crop type
✔️Actual product weight
✔️All key quality indicators

This allows you to assess the situation instantly—without phone calls, outdated Excel reports based on manual logs, or "on-site" double-checks (like physical silo tapping).

Every silo is at your fingertips: you clearly see what’s inside, how much free space is left, and where potential quality risks may arise.
As a result, you make decisions based on real-time facts, not assumptions.
Less uncertainty — more control.

Want to see it in action? Message us, and we’ll demonstrate how it works for your specific case.

A bucket elevator can operate stably for years — or cause constant problems right from the start.The reason is often not...
14/04/2026

A bucket elevator can operate stably for years — or cause constant problems right from the start.
The reason is often not the equipment itself, but common installation errors:

◾ Vertical misalignment of the shaft
◾ Lack of preliminary belt stretching
◾ Incorrect loading type
◾ Improper clearances in the elevator boot
◾ Lack of monitoring systems

The consequences are well-known: belt misalignment, overheating, downtime, and unplanned expenses.
In this article, experts break down 5 key mistakes and provide practical recommendations on how to avoid them during the installation stage.
🔗 Read more: https://zeo.ua/en/article/pomilki-montazhu-ta-ekspluataciji-noriy-yak-uniknuti-avariy-ta-prodovzhiti-vik-obladnannya

09/04/2026

First loading of corn into a new flat storage warehouse 🌽🏗️
The video shows the operation of a high-capacity conveying and processing line with a throughput of 1,000 t/h.

A combined solution based on P-series (port-type) equipment has been implemented: enclosed belt conveyors ZEO-BCE and open-type belt conveyors ZEO-BC.
The solution ensures energy-efficient and reliable operation and was developed by Grain Capital’s engineering team, taking into account real 24/7 operating conditions ⚙️

Construction of a feed mill and grain elevator in the Lviv region 🏗️20,000 tons of storage capacity, streamlined raw mat...
07/04/2026

Construction of a feed mill and grain elevator in the Lviv region 🏗️
20,000 tons of storage capacity, streamlined raw material logistics, and specialized solutions for complex processed products — this facility has been designed from the ground up to ensure stable and efficient operations.

Discover more about the key engineering solutions and the future organization of the silo park on our website 👇 https://zeo.ua/en/article/budivnictvo-kombikormovogo-zavodu-ta-elevatora-na-lvivshchini

🇺🇦 🤝 🇰🇿Grain Capital is actively participating in a large-scale business mission of Ukrainian manufacturers in Kazakhsta...
02/04/2026

🇺🇦 🤝 🇰🇿
Grain Capital is actively participating in a large-scale business mission of Ukrainian manufacturers in Kazakhstan. Our primary goal is to drive the export of grain storage solutions and implement advanced automation systems throughout the Central Asian market.

Following the official launch at the forum in Astana and the Kazakhstan Machinery Fair 2026, we have moved into intensive B2B negotiations with major industrial holdings. Our team is now preparing for site visits to key industrial centers to conduct audits for upcoming projects.

As the Ambassador of Ukraine, Victor Mayko, noted: "The tirelessness and resilience of Ukrainian business have been reaffirmed once again by this trip. Despite the distances and challenges, they find the opportunity to be here and engage in direct dialogue."

For our company, this represents another strategic step in strengthening international partnerships and scaling Ukrainian technologies globally.

We move forward. ⚙️🌾

Grain elevator efficiency today is not just about productivity, but about the correct selection of transport equipment.I...
24/03/2026

Grain elevator efficiency today is not just about productivity, but about the correct selection of transport equipment.

It is at this stage that the future cost of grain handling is determined—from drive loads to the choice of conveyor type.

We have briefly analyzed the key factors to consider when selecting equipment.

👉 Read more in the article: https://zeo.ua/en/article/yak-transportne-obladnannya-vplivaye-na-pributkovist-elevatora

19/03/2026

Preparing the technical base for receiving the new grain harvest is one of the key stages of elevator operations. We’re confident you’ve already identified bottlenecks and prepared a list of equipment for replacement to avoid downtime during the season ⚙️.

The technical base is already in full swing, so don’t wait — contact us at 067-558-58-37 and reserve the necessary items in stock 📞.

Address

Romania, Bucharest Sector 2, Pipera Road No. 41, Et. 7
Bucharest
014254

Opening Hours

Monday 09:00 - 17:30
Tuesday 09:00 - 17:30
Wednesday 09:00 - 17:30
Thursday 09:00 - 17:30
Friday 09:00 - 17:30

Alerts

Be the first to know and let us send you an email when GCI-Grain Capital Industries posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to GCI-Grain Capital Industries:

Share