03/04/2024
Dismantle existing system and replace with 5tick system 3 r32 version. Dismantle and replace aircon opening with aluminium sheet (prevent corrosion due to rain) and wooden box up.
Like and share the post will be deeply appreciated. Thank you for support the support.
Why choose us? 🌨️
❄️Free on-site consultation
❄️Free trunking design consultation
❄️High pay up capital verifiable through BCA/ACRA
❄️HDB & BCA certified Air con contractor
❄️ISO safety and quality certified only by TUV Singapore
❄️Track Record & and visit us @ https://www.centuryaire.sg/our-projects