Geometri Makina

When concrete work becomes repetitive, precision and daily output become everything.Another GEOMETRI GC25-X4 Concrete Cu...
07/06/2026

When concrete work becomes repetitive, precision and daily output become everything.

Another GEOMETRI GC25-X4 Concrete Curber / Slipform Paver has been completed and is now ready for delivery.

Built for contractors who need a compact, flexible and powerful slipform solution for:

✅ curbs
✅ gutters
✅ ditch profiles
✅ narrow concrete paving
✅ concrete barriers
✅ urban infrastructure works

With crawler mobility, hydraulic control, Cummins power and practical mold flexibility, the GC25-X4 is designed to help contractors reduce manual work, improve consistency and increase daily production on site.

Technical highlights:
• Model: GC25-X4
• Engine: Cummins
• Power: 180 HP / 134 kW
• Machine weight: 16,000 kg
• Origin: Made in Türkiye

Looking for a reliable slipform paving solution for your next concrete infrastructure project?

Contact GEOMETRI MAKINA:
🌐 www.geometrimakina.com
📧 [email protected]

GEOMETRI MAKINA
Slipform Concrete Paving & Canal Lining Solutions

05/05/2026

Extreme heat. Harsh environment. Zero compromise.

This is not just concrete paving.
This is the GC25 Slipform Paver performing continuous New Jersey Barrier construction under tough site and climate conditions.

Why does it matter?

Because in infrastructure projects, the real challenge is not only the design — it is ex*****on under pressure:

❌ High temperature
❌ Interrupted concrete supply
❌ Variable workmanship
❌ Alignment issues
❌ Quality inconsistency

With GC25, the process is different:

✅ Continuous slipform paving
✅ Monolithic in-situ concrete barrier
✅ Integrated vibration for uniform compaction
✅ Accurate alignment and geometry
✅ Reduced joints and weak interfaces
✅ Faster ex*****on with lower exposure to heat
✅ Consistent quality over long project lengths

GC25 is not only for New Jersey Barriers.
It is a heavy-duty multi-purpose slipform platform suitable for:

✔️ New Jersey Barriers
✔️ Roadside barriers
✔️ Road curbs & kerbs
✔️ Sidewalks and urban pavements
✔️ Drainage channels
✔️ V-Ditch profiles
✔️ Road shoulders and edge paving
✔️ Parking areas
✔️ Municipal and infrastructure works

If you are still relying only on manual casting or precast installation, you may be losing time, consistency, and long-term durability.

🔥 Have a road, airport, municipality, or infrastructure project?
Send us your project details, ex*****on length, profile type, and location — and our team will provide a technical evaluation and the suitable slipform solution.

Contact GEOMETRI today and let the machine do the precision work.

What is the biggest challenge in New Jersey barrier construction?
1️⃣ Quality
2️⃣ Alignment
3️⃣ Speed
4️⃣ Cracking

Comment your answer below 👇

How do you line a 10.5-meter inclined canal slope with high accuracy?On the Upper Shirvan Canal Project in Azerbaijan, G...
03/05/2026

How do you line a 10.5-meter inclined canal slope with high accuracy?

On the Upper Shirvan Canal Project in Azerbaijan, GEOMETRI slipform canal lining technology is working on one of the most demanding concrete lining applications: inclined canal side slopes.

The machine is designed to pave and line sloped canal walls with concrete thicknesses ranging from 10 cm up to 40 cm, depending on project requirements.

What makes this application special?

✅ Continuous slipform concrete paving
✅ Accurate lining over inclined canal walls
✅ Concrete placement over waterproofing membranes
✅ Compatible with geotextile layers
✅ Works over reinforcement steel and welded mesh
✅ High-quality surface finish for hydraulic flow
✅ Reduced manual dependency
✅ Suitable for irrigation canals and water conveyance projects

This technology helps deliver a durable, uniform, and high-standard concrete lining for projects where geometry, water flow, and long-term performance matter.

📍 Project Reference: Upper Shirvan Canal – Azerbaijan
📐 Inclined slope length: approx. 10.5 m
🧱 Concrete lining thickness: 10–40 cm, based on project design

What do you think is the biggest challenge in canal lining projects?
1️⃣ Maintaining slope geometry
2️⃣ Protecting waterproofing layers
3️⃣ Concrete quality and finishing
4️⃣ Productivity and delivery time

Comment your answer below 👇
For project evaluation and technical consultation, contact GEOMETRI MAKINA.

Address

Ahi Evran Caddesi No : 123 Ostim/ANKARA/TÜRKİYE
Ankara
06590

Opening Hours

Monday 08:30 - 18:30
Tuesday 08:30 - 18:30
Wednesday 08:30 - 18:30
Thursday 08:30 - 18:30
Friday 08:30 - 18:30
Saturday 08:30 - 18:30

Telephone

+905353887299

Alerts

Be the first to know and let us send you an email when Geometri Makina posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Geometri Makina:

Shortcuts

Share