31/07/2026
Summary
Fact of the project: organization of the peat extraction with subsequent production of electricity and heat energy to the small power plant. Type of product: milled peat, heat and electrical energy. Nevertheless of the probable redundance of energy-producing capacities in Ukraine we are facing in the nearest future the lack on electricity. It is directly connected with the decommissioning of the 9 nuclear power generating units from the existing 15 building the energetic independence of the country (15 power generating units produce 50 % of the electricity of Ukraine). 85 coal power generating units of the Ukraine with total capacity of 21 320 MWe have currently running time approximately 300 thousand hours, what exceeds 3 time more the forecasted operating resource. The most problematic factor at the Ukrainian energetic is the significant depreciation of thermal and nuclear power station blocks and other power energy equipment. Price for natural gas for Ukraine exceeds currently 500 USD for 1 thousand m3 and there is no premises for its decreasing. Although many factors have contributed to higher crude oil prices, a combination of strong (and somewhat unexpected) global demand for oil since 2003 and expectations of continuing future tightness is the major cause. These demand/supply imbalances reflect robust global activity, an apparent shift in the demand for oil by China and other emerging economies, and limited investment in the oil sector in the past two decades. Naturally, given the tightness in the oil market and uncertainties about demand and supply, factors such as geopolitical developments, fears of potential supply disruptions, and speculation have also all played a part in price movements, but largely through their impact on expectations regarding future fundamentals. Ukraine has large reserves of coal, but the most promising and profitable deposits already taken out. Left is less promising, capital-intensive deposits and the real cost of Ukrainian coal above the Polish and world average prices. To implement the project need 37.5 million euro.