30/09/2025
We proposed TURNKEY. You opted for LABOUR ONLY. Now take it from here:-
Labor-Only Construction Services
You supply the materials – we provide the professional labor!
Our Services & Labor Costs (UGX):
🔹 Septic Tank Construction: 800,000 – 1,200,000
🔹 Soakaway Pit Construction: 500,000 – 900,000
🔹 Combined Septic + Soakaway: 1,200,000 – 2,000,000
🔹 Exterior Painting (per m²): 6,000 – 10,000
🔹 Interior Painting (per m²): 5,000 – 8,000
🔹 Wall Preparation (per m²): 4,000 – 7,000
🔹 Stone Wall Construction (per m³): 50,000 – 90,000
🔹 Stone Cladding/Finishing (per m²): 20,000 – 40,000
🔹 Roof Installation (per m²): 15,000 – 25,000
🔹 Roof Repair (per m²): 10,000 – 20,000
🔹 Floor Tiling (per m²): 7,000 – 12,000
🔹 Wall Tiling (per m²): 8,000 – 15,000
🔹 Wardrobe Assembly & Finishing: 500,000 – 900,000/unit
🔹 Kitchen Cabinet Installation: 700,000 – 1,200,000/unit
🔹 Doors Installation & Finishing: 150,000 – 300,000/door
🔹 Window Frames Installation & Finishing: 100,000 – 200,000/window
🔹 Concrete Driveway Paving (per m²): 10,000 – 15,000
🔹 Interlocking Tile Paving (per m²): 12,000 – 20,000
🔹 Gravel Driveway (per m²): 6,000 – 10,000
🔹 Electrical Installation (per point): 10,000 – 20,000
🔹 Wiring (per meter): 2,500 – 5,000
🔹 Electrical Maintenance (per hour): 30,000 – 60,000
✨ How It Works:
1️⃣ You supply the materials
2️⃣ We provide a labor quote
3️⃣ We complete the work professionally
📞 Contact Us: +256 775 203 930