Kay-Lit Engineering Consultancy

Call Directions Contact the business

Kay-Lit Engineering Consultancy We offer all kinds of architectural, structural and Interior designs plus construction services

29/07/2026
28/07/2026

The client blamed the box house. The real problem? Poorly constructed box gutters.
With the right materials, proper detailing, and quality workmanship, box gutters don't leak, they last.

08/02/2026

Home gym becomes a death sentence
🇺🇬 ❤️❤️

04/02/2026

For years on site, we’ve been ordering ¾ aggregate because that’s what everyone uses, without ever asking why.
The answer is in Eurocode 2 (EN 1992-1-1, Clause 8.2 under placing and compaction of concrete.
The code limits the maximum aggregate size to ¾ of the minimum clear spacing between reinforcement bars or ¾ of the nominal concrete cover.
If the stones are bigger than the space meant for concrete to flow, they block, cause honeycombing, and weaken bond and durability.
So that familiar “¾” at the quarry isn’t a market rule, it’s geometry driven by reinforcement detailing and cover requirements.

❤️❤️ 🇺🇬

04/02/2026

For years on site, we’ve been ordering ¾ aggregate because that’s what everyone uses, without ever asking why.
The answer is in Eurocode 2 (EN 1992-1-1, Clause 8.2 under placing and compaction of concrete.
The code limits the maximum aggregate size to ¾ of the minimum clear spacing between reinforcement bars or ¾ of the nominal concrete cover.
If the stones are bigger than the space meant for concrete to flow, they block, cause honeycombing, and weaken bond and durability.
So that familiar “¾” at the quarry isn’t a market rule, it’s geometry driven by reinforcement detailing and cover requirements.

12/01/2026

This may look funny but it’s a common and dangerous practice.
Residential upper floors (Eurocode Category A) are designed for about 2.0 kN/m², not gym use.
Home gyms can impose 4 to 5 kN/m² plus dynamic impact from treadmills and weights.
A floor designed for a sofa can fail under exercise loads.
If it wasn’t designed for it, keep the gym on the ground floor.

11/01/2026

No drawings, no concrete or reinforcement records.
So before building up, we verified the structure’s capacity and load path.

Address

Naguru Drive Close
Kampala

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Friday 09:00 - 17:00
Saturday 09:00 - 17:00

Telephone

0701219056

Website

Alerts

Be the first to know and let us send you an email when Kay-Lit Engineering Consultancy posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Kay-Lit Engineering Consultancy:

Shortcuts

Share