Production Tool Solution

Production Tool Solution Production Tool Solution
Helping Energy Operators Overcome Sand & Gas Locking Issues in ESP / PC Pum

Artificial Lift Production Engineers have a tough path, They are asked to maximize production and keep costs to a minimum. ESP systems are the go-to technology for high volume production but they are costly to operate, particularly when you have to contend with sand and debris in the stream. P*P systems are employed where there is a high expectation of entrained solids in the fluid, like after a

frac-job, unconsolidated formation or in coal bed methane fields. When there is a shut-down everyone crosses their fingers in hopes the pump will come back to full production or pump at all. Our specialty is helping Artificial Lift operators protect their pumps from sand & gas locking issues. Since 2009, Production Tool Solution, Inc (PTS) offers innovative services and solutions to upstream operators enabling reliable and affordable oil and gas production. Today, PTS is leveraging its field-proven solutions for submersible pumps and progressing cavity pumps. Additionally, PTS consultation services offer an unbiased perspective on production performance to allow operators verification they are achieving optimal run life of their pumping systems Eliminate Solids Settling on ESPs and P*Ps. The Production Tool Solution PAR Valve™ is a proven tool used to prevent solids settling on top of electrical submersible pumps during shut down. Upon stopping the system, the valve enables the fluid and solids in the tubing to be diverted to the annulus without settling on top of the pump. Applications:
Conventional O&G
Unconventional O&G
Coal Bed Methane
Gas Well Dewatering

Benefits:
Solid settling diversion
Eliminates stuck pumps
Eliminates broken shafts
Pressure actuated
Works in low flow wells
Simplistic, reliable design
Enhanced run life

The PAR Valve™ demonstrates a history of success with hundreds of installations worldwide in a variety of applications enabling operators to increase the run life of their electrical submersible pumps while minimizing the intervention cost. Everyone has issues, if yours have to do with Sand or Gas interference in your pumps, I will make a valuable member of your network. Website:
https://www.ptsprotects.com

Phone:
+1.972.741.5513

"As Thanksgiving approaches, we at Production Tool Solutions are reminded of how grateful we are for our wonderful team ...
11/22/2023

"As Thanksgiving approaches, we at Production Tool Solutions are reminded of how grateful we are for our wonderful team and valued clients. Your dedication and support mean the world to us. Wishing you a Thanksgiving filled with peace, love, and gratitude."

10/31/2023
The Jerry Lewis MDA Telethon: A Labor Day TraditionRemembering a Labor Day StapleFor many years, the Jerry Lewis MDA Lab...
09/04/2023

The Jerry Lewis MDA Telethon: A Labor Day Tradition

Remembering a Labor Day Staple

For many years, the Jerry Lewis MDA Labor Day Telethon was a staple of Labor Day weekend, raising money for the Muscular Dystrophy Association.

https://ptsprotects.com/

🎆 Happy Fourth of July to all my fellow professionals! 🇺🇸 Today, as we celebrate Independence Day, let's reflect on the ...
07/04/2023

🎆 Happy Fourth of July to all my fellow professionals! 🇺🇸 Today, as we celebrate Independence Day, let's reflect on the power of collaboration and teamwork. Just as our founding fathers worked together to forge a new nation, let's remember that success in the workplace is often achieved through collective efforts.

Here's to a day of unity, camaraderie, and shared achievements.

Have a fantastic Fourth of July!
Production Tool Solution

✨ Eid al-Adha is a time of unity and togetherness. May this special day strengthen the bonds of love and friendship amon...
06/27/2023

✨ Eid al-Adha is a time of unity and togetherness. May this special day strengthen the bonds of love and friendship among us all. Sending warm wishes to our Muslim clients across the globe.

From Your Friends @ PTS

🕌 Eid al-Adha commemorates the spirit of sacrifice and generosity. As we gather with family and friends, let us remember...
06/27/2023

🕌 Eid al-Adha commemorates the spirit of sacrifice and generosity. As we gather with family and friends, let us remember the values of compassion and charity. Eid Mubarak to all our Muslim clients and their loved ones!
From Your Friends at Production Tool Solution

Are you tired of dealing with costly and frustrating sanding-up issues in your oil well operations? The PAR Valve from P...
06/16/2023

Are you tired of dealing with costly and frustrating sanding-up issues in your oil well operations? The PAR Valve from PTS is the solution. With its low-maintenance design and two convenient sizes (3 1/2 & 2 7/8), our valve is easy to install and use. And, because it can prevent pump damage and increase pump life by up to three times, the PAR Valve is an investment that pays off in the long run. Contact us at +1 (310) 919-6408 to speak with a representative and learn more.

https:https://ptsprotects.com/



Shell ExxonMobil Chevron Chevron Technology Ventures ConocoPhillips Oxy EOG Resources Anadarko Petroleum Corporation Phillips 66 Valero Energy Inc. Marathon Petroleum Corporation Devon Energy

Looking for a cost-effective solution for sand control in your oil well operations? The PAR Valve from PTS is the answer...
06/15/2023

Looking for a cost-effective solution for sand control in your oil well operations? The PAR Valve from PTS is the answer. Our valve is designed to be simple and easy to use, reducing the cost and complexity of sand control for oil well operators. And, because it can increase pump life by up to three times, the PAR Valve is sure to pay for itself in no time.
See them work in action here:
https://lnkd.in/gT36V5v
https://lnkd.in/grreeNP

For more information, please visit our website: https://ptsprotects.com/

Shell ExxonMobil Chevron Chevron Technology Ventures ConocoPhillips Oxy EOG Resources Anadarko Petroleum Corporation Phillips 66 Valero Energy Inc. Marathon Petroleum Corporation Devon Energy

Are you experiencing sand issues in your oil well as a petroleum engineer or lease operator? It's possible that you're l...
06/14/2023

Are you experiencing sand issues in your oil well as a petroleum engineer or lease operator? It's possible that you're losing money and valuable production time due to pump failures and equipment damage. Luckily, Production Tool Solutions (PTS) provides a solution that addresses these problems: the PTS PAR Valve.

By installing the PTS PAR Valve, you can efficiently divert sand from your well and achieve longer pump run times. This results in increased productivity and decreased equipment costs. The valve comes in two sizes - 3 1/2" and 2 7/8" - to cater to your well's specific requirements. Furthermore, the valve's installation process is simple, saving you time and money in the long run.

Sand diversion is critical in oil wells because it can cause significant damage to downhole equipment, resulting in expensive repairs and loss of production time. With the PTS PAR Valve, you can rest assured that sand will remain out of your wellbore, minimizing the chances of equipment failure.

Moreover, longer pump run times allow you to extract more oil within a given time frame, increasing production and revenue. This feature is especially advantageous for lease operators who have limited time and resources and must make the most of them.

The PTS PAR Valve is an indispensable device for petroleum engineers or lease operators grappling with sand problems in oil wells. Don't let equipment damage, production downtime, and lost revenue hinder your growth. With the PTS PAR Valve, you can save time, money, and enhance your well's productivity.

See them work in action here:
https://lnkd.in/gT36V5v
https://lnkd.in/grreeNP
For more information, please visit our website: https://ptsprotects.com/

Shell ExxonMobil Chevron Chevron Technology Ventures ConocoPhillips Oxy EOG Resources Anadarko Petroleum Corporation Phillips 66 Valero Energy Inc. Marathon Petroleum Corporation Devon Energy

If you're facing sand problems in your oil well as a petroleum engineer or lease operator, you may be experiencing costl...
06/13/2023

If you're facing sand problems in your oil well as a petroleum engineer or lease operator, you may be experiencing costly pump failures and equipment damage that are hampering your productivity. Luckily, Production Tool Solutions (PTS) has come up with a solution - the PTS PAR Valve.

With the installation of the PTS PAR Valve, you can efficiently divert sand from your oil well, increase your pump run times and enjoy higher productivity rates, all while keeping your equipment maintenance costs at a minimum. The valve is available in two sizes - 3 1/2" and 2 7/8" - depending on your well's specific needs. Moreover, it is super easy to install, which will save you both time and money in the long run.

Given the fact that sand can cause expensive repairs, costly equipment damage and production downtime in oil wells, sand diversion is of utmost importance. By deploying the PTS PAR Valve, you are guaranteed that sand stays out of your oil well, reducing the likelihood of equipment failure.

Furthermore, an increase in your pump run times via the valve can result in the extraction of more oil within the same timeframe, thereby driving up production and revenue. This is a particularly useful advantage for lease operators who need to utilize their resources and time to the fullest.

The PTS PAR Valve is an essential equipment for every petroleum engineer or lease operator encountering sand issues in their oil wells. Say goodbye to lost revenue, equipment damage and productivity downtime. By fitting the PTS PAR Valve, your oil well will enjoy improved productivity, enabling you to save time, cut down on expenses and improve your revenue.

See them work in action here:
https://lnkd.in/gT36V5v
https://lnkd.in/grreeNP

For more information, please visit our website: https://lnkd.in/gT36V5v

Shell ExxonMobil Chevron Chevron Technology Ventures ConocoPhillips Oxy EOG Resources Anadarko Petroleum Corporation Phillips 66 Valero Energy Strong Black Gold Pump & Supply, Inc.. Marathon Petroleum Corporation Devon Energy

Address

Acton, CA
93510

Telephone

(972) 741-5513

Website

Alerts

Be the first to know and let us send you an email when Production Tool Solution posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category