Stacy Witbeck

Stacy Witbeck A partner you can trust.

09/09/2026

San Diego's Orange Line is getting a major upgrade🚆 New track, signals, and crossovers mean more flexibility for Metropolitan Transit System (MTS). We're on track to deliver by November 2026.

💪

09/06/2026

Dedication, hard work, and precision are the qualities that define our crews and the work they do to move communities forward. Thank you for making that vision real, every day.

💪

32 years ago, Bobby Peacock Jr. started at Stacy Witbeck. He's still here — because growth comes from taking the leap, n...
09/04/2026

32 years ago, Bobby Peacock Jr. started at Stacy Witbeck. He's still here — because growth comes from taking the leap, not staying comfortable.

His story is part of our "People Who Build" series, celebrating the people behind the work.

▶️ Check it out: https://na2.hubs.ly/H07F6W70

08/26/2026

As the project takes shape, the Omaha Streetcar 🚆 is building momentum.

Crews are nearing completion on the tangent track and pre-curves within the 5.5 mile alignment, marking another major step forward as the project continues to take shape.

With more than 7,000 track feet of concrete poured, each milestone brings the project closer to connecting Omaha's urban core. This progress is made possible through the coordination and craftsmanship of our project partners; Kiewit Corporation and Mass. Electric Construction Co.

Once complete, the streetcar will make it easier for residents and visitors to explore new destinations, supporting greater connectivity and access throughout the city.

We are transforming Omaha, one milestone at a time.

💪

Two of our water market experts, Matt Kuzmick and Will Golubics, took the pen to paper for the Water Collaborative Deliv...
08/20/2026

Two of our water market experts, Matt Kuzmick and Will Golubics, took the pen to paper for the Water Collaborative Delivery Association.

Cost certainty in projects comes from a handful of conversations that happen early, or fail to happen at all, and the difference shows up months later when two sides realize they were never aligned when it came to the cost and pricing. Most of what follows will sound familiar. The hard part isn’t learning it; it’s doing it consistently and trusting the process.

▶️ Check it out:

Cost certainty in projects comes from a handful of conversations that happen early, or fail to happen at all, and the difference shows up months later when two sides realize they were never aligned when it came to the cost and pricing.

08/20/2026

A first for the U.S. is happening in Bluffdale, Utah: Two massive concrete boxes, pushed underneath live railroad tracks.

The result: a brand new four-lane roadway, built in partnership with Ralph L. Wadsworth Construction.

Construction Manager Doug Belsheim walks us through it.

💪

San Fernando Transit Constructors, JV with Skanska USA has been awarded an additional $2.4B contract with LA Metro for t...
08/14/2026

San Fernando Transit Constructors, JV with Skanska USA has been awarded an additional $2.4B contract with LA Metro for the East San Fernando Valley Light Rail Transit Project to deliver 6.7 miles of light rail and 11 new stations along the Van Nuys Boulevard corridor.

👉Read more: https://na2.hubs.ly/H07bWlC0

A region to watch: East San Fernando Valley 🌴The East San Fernando Valley Light Rail Project is moving forward, and new ...
08/11/2026

A region to watch: East San Fernando Valley 🌴

The East San Fernando Valley Light Rail Project is moving forward, and new opportunities are coming with it: superintendents and engineer roles are opening over the next 6-18 months. This is long-term, high-profile work with an employee-owned company.

Register your interest -> https://na2.hubs.ly/H076bwC0

💪

A major🚆milestone moves the project one step closer.FrontRunner 2X has been recommended for Entry into Engineering (EIE)...
08/10/2026

A major🚆milestone moves the project one step closer.

FrontRunner 2X has been recommended for Entry into Engineering (EIE), with approximately $1.29 billion in federal funding.

This recommendation marks a significant milestone for the project and an important step toward securing a Full Funding Grant Agreement.

As one of the fastest growing areas in the country, investing in transit will serve the region for generations to come.

Learn more about this major milestone for FrontRunner 2X:
https://na2.hubs.ly/H075bKD0

💪

08/03/2026

Construction has a way of showing you what you're capable of. Meet Mitch Schwab, Field Engineer.

Every job asks something different of you. For Mitch, that's meant learning from the people around him, taking on more responsibility, and leaving each job a little better than he found it.

Keep learning. Keep building. Keep moving forward.

💪

Address

2800 Harbor Bay Pkwy
Alameda, CA
94502

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+15107481870

Alerts

Be the first to know and let us send you an email when Stacy Witbeck posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share