08/06/2026

Project Announcement: $100,000,000,000 data center to be built in...

Paducah, Kentucky.

The U.S. Department of Energy, NextEra, and Brookfield announced plans to redevelop the old Paducah Gaseous Diffusion Plant site in western KY.

They’re calling it the Paducah American Energy Hub. It will be one of the biggest projects in state history.

It's actually two projects in one: an AI data center campus (Brookfield's building it) and dedicated power generation to run it (NextEra's building that).

Data center details: up to 1.8 GW capacity, on about 600 acres, with closed-loop cooling. First operations 2028, construction done by 2031. Site already has transmission, water, and fiber in place, so it could move fast once permits clear.

Power generation details: up to 2 GW of new gas generation, plus 2.6 GW of battery storage. Batteries could be online as soon as 2028.

Jobs: 8,000+ construction, 600+ permanent after.

The project was just announced, so details are limited. Environmental review and local permitting are in progress, and they haven't finalized exact power infrastructure locations yet.

But this is the moment to start watching before GC selection and bid lists open up.

Keep an eye on Brookfield and any RFPs from Big Rivers Electric, Jackson Purchase Energy Cooperative, or Paducah Power System.

p.s. want a list of data center projects like this one that are under construction? get the spreadsheet here: constructiontrends.co

Industry changing maneuver
05/23/2026

Industry changing maneuver

Alabama’s $1 billion coal project is built around a very specific market: steelmaking coal.

Warrior Met Coal’s Blue Creek mine in Tuscaloosa County is one of the largest new U.S. metallurgical coal developments in years. It isn’t being built for power plants. Its coal is aimed at coke ovens, where high-grade coking coal remains a key input for blast furnace steelmaking.

The mine gives Warrior access to one of North America’s largest undeveloped premium High Vol A metallurgical coal reserves. The company expects Blue Creek to average about 6 million short tons a year during its first decade, lifting Warrior’s annual nameplate capacity by roughly 75%.

The project also adds a long-term industrial footprint in western Alabama. Raw coal travels about 9.5 miles from the mine to the processing site, with new conveyor, rail and barge infrastructure built around the operation.

The showcase piece is the preparation plant.

Blue Creek’s new plant is designed to process up to 2,400 raw tons per hour, making it one of the most modern coal prep plants in the U.S. It uses heavy-media cyclones for primary separation, large-diameter cyclones for intermediate material, spirals for finer fractions and froth flotation for the smallest coal particles.

That system is built to separate marketable coal from rock and impurities before shipment.

For Warrior, the plant is as important as the mine itself. Premium met coal only earns premium pricing if it meets strict steelmaking specs.

Blue Creek is therefore not just a new mine. It’s a full export coal system built for high-volume, high-quality coking coal production.

-

Photo: Warrior Met Coal

-

Oil&gas demand rising, get your wells drilled today!
03/25/2026

Oil&gas demand rising, get your wells drilled today!

12/04/2025

Benchmark U.S. natural gas prices are ending 2025 in the manner that they began - with a strong rally. And that's bad news for people hoping for further cuts to U.S. coal use.

07/30/2025

Despite record LNG exports and several projects under construction, the U.S. lacks the short-term infrastructure to meet the massive increase in demand.

04/15/2025

What a Masters weekend! The weather is finally turning, the grass is greening up, and 76 Falls Country Club is almost ready to open for the season.

We’re putting the final touches on everything and can’t wait to see everyone back out on the course soon. Stay tuned—opening day is just around the corner!

03/26/2025

“People are starting to look around and say where’s that additional supply going to come from?” said Eli Rubin, senior energy analyst at EBW Analytics. “Production may be up a bit, but it’s not going to keep pace with the demand.”

03/08/2025

Rising natural gas prices, driven by depleted inventories and increased LNG demand, are setting the stage for a rebound in U.S. gas production following months of curtailments.

02/25/2025

Global LNG demand is projected to surge by 60% through 2040, primarily driven by Asia's economic growth, industrial decarbonization, and the increasing power demands of artificial intelligence.

01/05/2025

Address

3088 N Highway 127
Albany, KY
42602

Alerts

Be the first to know and let us send you an email when Crudewell Drilling Inc posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Crudewell Drilling Inc:

Shortcuts

Share

Category