02/05/2025
We are extremely proud of the multiple crews that work on this project. This would be a first for all 3 divisions of Avon Corporation working on the same project. The project was mainly a stream restoration with a slope stability issue that required 100 plus soils nails to stabilize the slope so a new 200’ long post and panel wall could be installed. Once all the geo work was completed the stream restoration could be installed. Excellent job by all.