03/02/2026
Plumbing starts long before fixtures go in.
This project required underground excavation, new drain line installation, and slab restoration to support the updated layout.
Done right below the surface so everything above it works flawlessly.
ECS Construction
One team. One schedule.
📞 610.820.0108 | 🌐 ECSCM.com