01/08/2026
Client, an experienced Construction women, 34 year Naval Veteran knows what she's looking at and has performed the work multiple times herself and chose Mae systems llc for her bathroom remodel, after the original builder of her condo Construction Omission finally came to light. Her shower base collapsed and failed. The original builder left the concrete missing in what appears to be a plumbing repair/ realignment adjustment post slab placement We chose to perform this Hybrid remodel in a design build mode. Starting as a hard bid with complete discloser of line item costs, allowing the owner to engineer the design and choose costs in conjunction with her budget. Mae systems enlarged the existing shower without robbing the bathroom footprint Reworked drains to accommodate a larger shower pan. Placed new concrete and installed New Kohler Sterling Fiberglass base.Harti "Tile" board and Schluter system water proofing Porcelain large format (2'x4' tiles) were set incorporating a Niche and glass Shelf. Grab bars to grip if needed along with a new easy glide dampening Glazing system by Delta. Phase one also included New Duralux LVP flooring laid on 1/2 bond pattern and accent moldings. The missing mirror was donated to a local youth Dance studio per clients request. Our client is extremely happy that we identified and accommodated this out of sequence request, without making a mess for her space.
Mae systems will return in a month or so to remove, raise and paint cabinets, new hardware, Vanity tops, faucets are also on the horizon along with Color pallet updates to flow or accent the new tiles.