10/21/2026
Can Power Plus handle the permits, drawings, and utility coordination for your temporary power?
Yes, we can handle as much or as little as you need.
Our team can pull permits, design your temporary power plan, and prepare installation drawings that we review with your superintendent. For larger services that require a single-line diagram, we have people in-house who prepare and submit those drawings to the utility or Building & Safety, with that work included in the project scope and pricing.
Full-site electrical engineering isn’t typically part of a temporary power scope, but that capability is available when your project calls for it. Tell us what your team has covered and where you need support. We’ll work with you to build the scope around your project.